Project intelligenceTDLR TABS2024018402Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Lela, Jones, Foote & Bradley Infrastructure Improvements

Lela St, Jones St, Foote St, & Bradley St, Mckinney, TX, 75069

Opening ~Oct 2026Review Complete

Lela, Jones, Foote & Bradley Infrastructure Improvements is a renovation/alteration project at Lela St, Jones St, Foote St, & Bradley St, Mckinney, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $2.0M across about 109,991 sq ft.

Estimated project value
$2.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
109,991 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$18/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 13, 2024871 days across supplied datesOct 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    813 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75069 (Mckinney)

One email per change. Unsubscribe in one click. Privacy.

Lela, Jones, Foote & Bradley Infrastructure Improvements is a Renovation/Alteration project located at Lela St, Jones St, Foote St, & Bradley St,, Mckinney, TX 75069 in Mckinney, Texas. The project has an estimated value of $2.0M covering 109,991 sq ft. City of McKinney is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on May 13, 2024.

Frequently Asked Questions

What is Lela, Jones, Foote & Bradley Infrastructure Improvements?

Lela, Jones, Foote & Bradley Infrastructure Improvements is a renovation/alteration project at Lela St, Jones St, Foote St, & Bradley St in Mckinney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Roadway reconstruction within the existing Right-of-Way including Sidewalk, Drainage, and Utility Improvements. 17,411 Sq. Ft of Sidewalk and 109,991 Sq. Ft of Roadway Paving

Is Lela, Jones, Foote & Bradley Infrastructure Improvements open in Mckinney?

Lela, Jones, Foote & Bradley Infrastructure Improvements is still under construction in Mckinney, TX, with an estimated completion of Oct 2026 according to its TDLR registration.

Where is Lela, Jones, Foote & Bradley Infrastructure Improvements located?

Lela, Jones, Foote & Bradley Infrastructure Improvements is located at Lela St, Jones St, Foote St, & Bradley St, Mckinney, TX, 75069, in Collin County.

Who is the owner or developer of Lela, Jones, Foote & Bradley Infrastructure Improvements?

City of McKinney is the property owner/developer of record for Lela, Jones, Foote & Bradley Infrastructure Improvements, per its TDLR project registration.

Who is the architect or design firm for Lela, Jones, Foote & Bradley Infrastructure Improvements?

Freese and Nichols, Inc. is the design firm of record for Lela, Jones, Foote & Bradley Infrastructure Improvements, according to its TDLR filing.

How much does Lela, Jones, Foote & Bradley Infrastructure Improvements cost and how big is it?

Lela, Jones, Foote & Bradley Infrastructure Improvements has an estimated construction value of $2.0M and approximately 109,991 square feet (about $18/sqft), based on its TDLR filing.

Scope of Work

Roadway reconstruction within the existing Right-of-Way including Sidewalk, Drainage, and Utility Improvements. 17,411 Sq. Ft of Sidewalk and 109,991 Sq. Ft of Roadway Paving

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Lela St, Jones St, Foote St, & Bradley St, Mckinney, TX, 75069

Location by street address

Watch all construction in 75069 (Mckinney)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mckinney?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.