Project intelligenceTDLR TABS2024018533Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

American Airlines Back of House Restrooms Terminal A in Grapevine, TX

2040 North International Parkway, Grapevine, TX, 75261

Target date passed (Jun 2025)Project Registered

American Airlines Back of House Restrooms Terminal A is a renovation/alteration project at 2040 North International Parkway, Grapevine, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.2M across about 5,000 sq ft.

Estimated project value
$3.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$647/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 14, 2024398 days across supplied datesJun 16, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Grapevine)

One email per change. Unsubscribe in one click. Privacy.

American Airlines Back of House Restrooms Terminal A is a Renovation/Alteration project located at 2040 North International Parkway, Grapevine, TX 75261 in Grapevine, Texas. The project has an estimated value of $3.2M covering 5,000 sq ft. American Airlines is the property owner. The project was registered with TDLR on May 14, 2024.

Frequently Asked Questions

What is American Airlines Back of House Restrooms Terminal A?

American Airlines Back of House Restrooms Terminal A is a renovation/alteration project at 2040 North International Parkway in Grapevine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of 24 employee restrooms

Is American Airlines Back of House Restrooms Terminal A open in Grapevine?

American Airlines Back of House Restrooms Terminal A was scheduled to finish construction in Jun 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is American Airlines Back of House Restrooms Terminal A located?

American Airlines Back of House Restrooms Terminal A is located at 2040 North International Parkway, Grapevine, TX, 75261, in Dallas County.

Who is the owner or developer of American Airlines Back of House Restrooms Terminal A?

American Airlines is the property owner/developer of record for American Airlines Back of House Restrooms Terminal A, per its TDLR project registration.

How much does American Airlines Back of House Restrooms Terminal A cost and how big is it?

American Airlines Back of House Restrooms Terminal A has an estimated construction value of $3.2M and approximately 5,000 square feet (about $647/sqft), based on its TDLR filing.

Scope of Work

Renovation of 24 employee restrooms

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2040 North International Parkway, Grapevine, TX, 75261

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75261 (Grapevine)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Grapevine?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.