The Heights - 2210 is a renovation/alteration project at 2210 Bryan Place, Midlothian, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.3M across about 6,450 sq ft.
Final inspection completed, awaiting project closure
The Heights - 2210 is a Renovation/Alteration project located at 2210 Bryan Place, Midlothian, TX 76065 in Midlothian, Texas. The project has an estimated value of $1.3M covering 6,450 sq ft. The Heights, Ellis County Family Resources is the property owner and Studio E Design Group is the design firm of record. The project was registered with TDLR on May 16, 2024.
The Heights - 2210 is a renovation/alteration project at 2210 Bryan Place in Midlothian, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior gut of a 6,450 SF existing building to be renovated into a safe-house.
Construction on The Heights - 2210 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
The Heights - 2210 is located at 2210 Bryan Place, Midlothian, TX, 76065, in Ellis County.
The Heights, Ellis County Family Resources is the property owner/developer of record for The Heights - 2210, per its TDLR project registration.
Studio E Design Group is the design firm of record for The Heights - 2210, according to its TDLR filing.
The Heights - 2210 has an estimated construction value of $1.3M and approximately 6,450 square feet (about $194/sqft), based on its TDLR filing.
Interior gut of a 6,450 SF existing building to be renovated into a safe-house.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 16, 2024
Review Complete
May 16, 2024
Inspection Complete
Jun 24, 2026
Closed
769d
Construction phase