Final inspection completed, awaiting project closure
Downhole Chemical Offices is a Additions to Existing Building project located at 7274 Elm, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $275K covering 1,250 sq ft. Dynamic Chemical Solutions, Inc. is the property owner and Parmadesign is the design firm of record. The project was registered with TDLR on May 28, 2024.
Downhole Chemical Offices is a additions to existing building project at 7274 Elm, Frisco, TX 75034 in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximate 1250 squre foot addition to existing residential grade office structure. Existing structure to be remodelled and addition to include two new restrooms, kitchen break room, 9 offices, and storage.
Construction on Downhole Chemical Offices is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Downhole Chemical Offices is located at 7274 Elm, Frisco, TX 75034, Frisco, TX, 75034, in Collin County.
Dynamic Chemical Solutions, Inc. is the property owner/developer of record for Downhole Chemical Offices, per its TDLR project registration.
Parmadesign is the design firm of record for Downhole Chemical Offices, according to its TDLR filing.
Downhole Chemical Offices has an estimated construction value of $275K and approximately 1,250 square feet (about $220/sqft), based on its TDLR filing.
Approximate 1250 squre foot addition to existing residential grade office structure. Existing structure to be remodelled and addition to include two new restrooms, kitchen break room, 9 offices, and storage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 28, 2024
Review Complete
May 28, 2024
Inspection Complete
Jan 4, 2026
Closed
586d
Construction phase