Project intelligenceTDLR TABS2024019453New Construction
Funding type

This project is privately funded, on private land for private use.

BSRO Firestone

5012 Troup HWY, Tyler, TX, 75707

Target date passed (Jan 2026)Review Complete

BSRO Firestone is a new construction project at 5012 Troup HWY, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.5M across about 6,769 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,769 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$369/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 28, 2024583 days across supplied datesJan 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    399 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About BSRO Firestone

A ground-up construction project for a Firestone Complete Auto Care facility is registered with TDLR at 5012 Troup HWY in Tyler, Smith County. The filing specifies a new building of 6,769 square feet with an estimated cost of $2,500,000. This places the project in the top quarter of estimated costs for new construction filings in Smith County over the last 24 months, where the median estimated cost is $832,600.

The owner of record is Jones Hummel Holdings, LLC, and the design firm is SGA Design Group, P.C. The project was registered with TDLR in May 2024, and plan review was completed in the same month. Construction was scheduled to begin in July 2025, with a completion date listed as January 2026. Although that date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Scope and Design

The scope of work describes a ground-up construction of a 6,769 SF Firestone Complete Auto Care Facility. The estimated cost per square foot is $369, which is above the county median of $162 per square foot for similar new construction projects. SGA Design Group, P.C. has been involved in six other TDLR-registered projects in Texas, including a Firestone location in La Porte and a Walmart in El Paso, all with review complete status.

Nearby businesses include a Walmart Supercenter, Murphy USA, and Subway. The surrounding area, ZIP 75707, has a population of about 16,355 and a median household income of $85,406 according to U.S. Census ACS 2023 five-year estimates. Housing in this area is predominantly owner-occupied, with a median home value of $256,300.

This project is privately funded on private land for private use. The scheduled build window of 184 days is close to the county median of 214 days for new construction. Other registered projects in the immediate area include renovations for The Park at Shiloh Apartments and XPress Car Wash, as well as a new construction project for SBL Systems Offices Building.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75707 (Tyler)

One email per change. Unsubscribe in one click. Privacy.

BSRO Firestone is a New Construction project located at 5012 Troup HWY, Tyler, TX 75707 in Tyler, Texas. The project has an estimated value of $2.5M covering 6,769 sq ft. Jones Hummel Holdings, LLC is the property owner and SGA Design Group, P.C. is the design firm of record. The project was registered with TDLR on May 28, 2024.

Frequently Asked Questions

Is the Firestore Complete Auto Care store open?

The TDLR record shows plan review completed in May 2024, but TDLR has not yet recorded a final inspection. Therefore, the current operational status of the business is not confirmed in the public construction record.

Who owns the Firestone Complete Auto Care project in Tyler?

The owner of record listed in the TDLR filing is Jones Hummel Holdings, LLC. The design firm of record is SGA Design Group, P.C.

What is the estimated cost of this new construction?

The estimated cost for the 6,769 square foot facility is $2,500,000. This figure is above the median estimated cost of $832,600 for new construction projects in Smith County.

When was the plan review completed?

TDLR completed plan review in May 2024. Construction was scheduled to start in July 2025, with a completion date of January 2026.

Is the site in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer.

What is BSRO Firestone?

BSRO Firestone is a new construction project at 5012 Troup HWY in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A ground-up construction of a 6,769 SF Firestone Complete Auto Care Facility.

Is BSRO Firestone open in Tyler?

BSRO Firestone was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is BSRO Firestone located?

BSRO Firestone is located at 5012 Troup HWY, Tyler, TX, 75707, in Smith County.

Who is the owner or developer of BSRO Firestone?

Jones Hummel Holdings, LLC is the property owner/developer of record for BSRO Firestone, per its TDLR project registration.

Who is the architect or design firm for BSRO Firestone?

SGA Design Group, P.C. is the design firm of record for BSRO Firestone, according to its TDLR filing.

How much does BSRO Firestone cost and how big is it?

BSRO Firestone has an estimated construction value of $2.5M and approximately 6,769 square feet (about $369/sqft), based on its TDLR filing.

Scope of Work

A ground-up construction of a 6,769 SF Firestone Complete Auto Care Facility.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5012 Troup HWY, Tyler, TX, 75707

Location by street address

Watch all construction in 75707 (Tyler)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.