AUS BJT Optimization/Passenger Boarding Bridge Replacement
AUS BJT Optimization/Passenger Boarding Bridge Replacement is a renovation/alteration project at 3600 Presidential Blvd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $15.0M across about 762,289 sq ft.
๐Project Metrics
TDLR #TABS2024019579Project Registered
Project has been registered with TDLR and is in pre-construction phase
AUS BJT Optimization/Passenger Boarding Bridge Replacement is a Renovation/Alteration project located at 3600 Presidential Blvd., Austin, TX 78719 in Austin, Texas. The project has an estimated value of $15.0M covering 762,289 sq ft. City of Austin Aviation Department is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on May 29, 2024.
โFrequently Asked Questions
What is AUS BJT Optimization/Passenger Boarding Bridge Replacement?
AUS BJT Optimization/Passenger Boarding Bridge Replacement is a renovation/alteration project at 3600 Presidential Blvd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Part of the Barbara Jordan Terminal Optimization, Package 3A includes the in-kind replacement of existing Passenger Boarding Bridges (PBBs), with upgraded MEP and low-voltage systems. No change to building square footage.
Is AUS BJT Optimization/Passenger Boarding Bridge Replacement open in Austin?
AUS BJT Optimization/Passenger Boarding Bridge Replacement is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Where is AUS BJT Optimization/Passenger Boarding Bridge Replacement located?
AUS BJT Optimization/Passenger Boarding Bridge Replacement is located at 3600 Presidential Blvd., Austin, TX, 78719, in Travis County.
Who is the owner or developer of AUS BJT Optimization/Passenger Boarding Bridge Replacement?
City of Austin Aviation Department is the property owner/developer of record for AUS BJT Optimization/Passenger Boarding Bridge Replacement, per its TDLR project registration.
Who is the architect or design firm for AUS BJT Optimization/Passenger Boarding Bridge Replacement?
Page Southerland Page, Inc. is the design firm of record for AUS BJT Optimization/Passenger Boarding Bridge Replacement, according to its TDLR filing.
How much does AUS BJT Optimization/Passenger Boarding Bridge Replacement cost and how big is it?
AUS BJT Optimization/Passenger Boarding Bridge Replacement has an estimated construction value of $15.0M and approximately 762,289 square feet (about $20/sqft), based on its TDLR filing.
๐Scope of Work
Part of the Barbara Jordan Terminal Optimization, Package 3A includes the in-kind replacement of existing Passenger Boarding Bridges (PBBs), with upgraded MEP and low-voltage systems. No change to building square footage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 29, 2024
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$3.67B total๐Related City Permits
Building permits found at or near this location
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
EM repair of 2.5 C for 225A panel feeders that faulted. Pulled new conductors and cut in pull points.
Replacement of an existing water heater replace ng water heater
Remodel of existing office spaces for tenant who is expanding into adjacent suites. Access control requested.
Per Tx Gas while they repair a gas leak on their main we need to relocate the gas meter away from windows electrical tankless crawl space vents.