Project intelligenceTDLR TABS2024020527New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Canterra Creek Sections 4-6 Landscape Improvements in Iowa Colony, TX

Bullard Parkway & Karsten Boulevard, Iowa Colony, TX, 77583

Target date passed (Feb 2025)Review Complete

Canterra Creek Sections 4-6 Landscape Improvements is a new construction project at Bullard Parkway & Karsten Boulevard, Iowa Colony, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.5M across about 236,500 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
236,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 11, 2024235 days across supplied datesFeb 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77583 (Iowa Colony)

One email per change. Unsubscribe in one click. Privacy.

Canterra Creek Sections 4-6 Landscape Improvements is a New Construction project located at Bullard Parkway & Karsten Boulevard, Iowa Colony, TX 77583 in Iowa Colony, Texas. The project has an estimated value of $1.5M covering 236,500 sq ft. BRAZORIA COUNTY MUNICIPAL UTILITY DISTRICT NO 31 is the property owner. The project was registered with TDLR on June 11, 2024.

Frequently Asked Questions

What is Canterra Creek Sections 4-6 Landscape Improvements?

Canterra Creek Sections 4-6 Landscape Improvements is a new construction project at Bullard Parkway & Karsten Boulevard in Iowa Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Planting, sidewalks, irrigation, playground equipment, site furniture, fine grade & hydromulch

Is Canterra Creek Sections 4-6 Landscape Improvements open in Iowa Colony?

Canterra Creek Sections 4-6 Landscape Improvements was scheduled to finish construction in Feb 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Canterra Creek Sections 4-6 Landscape Improvements located?

Canterra Creek Sections 4-6 Landscape Improvements is located at Bullard Parkway & Karsten Boulevard, Iowa Colony, TX, 77583, in Brazoria County.

Who is the owner or developer of Canterra Creek Sections 4-6 Landscape Improvements?

BRAZORIA COUNTY MUNICIPAL UTILITY DISTRICT NO 31 is the property owner/developer of record for Canterra Creek Sections 4-6 Landscape Improvements, per its TDLR project registration.

How much does Canterra Creek Sections 4-6 Landscape Improvements cost and how big is it?

Canterra Creek Sections 4-6 Landscape Improvements has an estimated construction value of $1.5M and approximately 236,500 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

Planting, sidewalks, irrigation, playground equipment, site furniture, fine grade & hydromulch

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Bullard Parkway & Karsten Boulevard, Iowa Colony, TX, 77583

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77583 (Iowa Colony)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Iowa Colony?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.