Project intelligenceTDLR TABS2024021079New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bagdad Road (CR 279) in Leander, TX

South of CR281 to North of San Gabriel River, Leander, TX, 78641

Target date passed (Mar 2026)Review Complete

Bagdad Road (CR 279) is a new construction project at South of CR281 to North of San Gabriel River, Leander, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $37.7M across about 1 sq ft.

Estimated project value
$37.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$37696.77K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 18, 2024621 days across supplied datesMar 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    545 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78641 (Leander)

One email per change. Unsubscribe in one click. Privacy.

Bagdad Road (CR 279) is a New Construction project located at South of CR281 to North of San Gabriel River, Leander, TX 78641 in Leander, Texas. The project has an estimated value of $37.7M covering 1 sq ft. Williamson County is the property owner and Binkley & Barfield, Inc. is the design firm of record. The project was registered with TDLR on June 18, 2024.

Frequently Asked Questions

What is Bagdad Road (CR 279)?

Bagdad Road (CR 279) is a new construction project at South of CR281 to North of San Gabriel River in Leander, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a three lane undivided roadway consisting of grading, flex base, asphalt pavement, retaining walls, bridge structures, storm sewers, culverts, erosion control, signing, and pavement markings.

Is Bagdad Road (CR 279) open in Leander?

Bagdad Road (CR 279) was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Bagdad Road (CR 279) located?

Bagdad Road (CR 279) is located at South of CR281 to North of San Gabriel River, Leander, TX, 78641, in Williamson County.

Who is the owner or developer of Bagdad Road (CR 279)?

Williamson County is the property owner/developer of record for Bagdad Road (CR 279), per its TDLR project registration.

Who is the architect or design firm for Bagdad Road (CR 279)?

Binkley & Barfield, Inc. is the design firm of record for Bagdad Road (CR 279), according to its TDLR filing.

How much does Bagdad Road (CR 279) cost and how big is it?

Bagdad Road (CR 279) has an estimated construction value of $37.7M and approximately 1 square feet (about $37696.77K/sqft), based on its TDLR filing.

Scope of Work

Construction of a three lane undivided roadway consisting of grading, flex base, asphalt pavement, retaining walls, bridge structures, storm sewers, culverts, erosion control, signing, and pavement markings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

South of CR281 to North of San Gabriel River, Leander, TX, 78641

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78641 (Leander)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.