WAY OF LIFE CHURCH
๐Project Metrics
TDLR #TABS2024021774Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
NEW CONSTRUCTION OF CHURCH BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Interior renovation - this will include new placement of sinks new storage cabinets and new custom wood seatings and custom metal floating shelves anchored..
Install 200A 120/208V overhead homebuilder loop with meter disconnect grounding and required GFCI outlets for temporary construction power. The service voltage on site is 120/240 the espa and load information on the permit match this. JD
Interior renovation - this will include new placement of sinks new storage cabinets and new custom wood seatings and custom metal floating shelves anchored..
Interior renovation - this will include new placement of sinks new storage cabinets and new custom wood seatings and custom metal floating shelves anchored..
Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <10 feet New 3/4 EMT conduit to power the Level 2 EV Charger at 48amp constant draw.