Wingstop
Wingstop is a renovation/alteration project at 170 FM 544 Suite 102, Murphy, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $175K across about 1,335 sq ft.
๐Project Metrics
TDLR #TABS2024022615Project Closed
Project has been completed and closed
Wingstop is a Renovation/Alteration project located at 170 FM 544 Suite 102, Murphy, TX 75094 in Murphy, Texas. The project has an estimated value of $175K covering 1,335 sq ft. Murphy Crossing Dallas, TX. LLC is the property owner and Kolbrook Design is the design firm of record. The project was registered with TDLR on July 9, 2024.
โFrequently Asked Questions
What is Wingstop?
Wingstop is a renovation/alteration project at 170 FM 544 Suite 102 in Murphy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,335 sf Renovation & new finishes throughout
Is Wingstop open in Murphy?
Construction on Wingstop is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.
Where is Wingstop located?
Wingstop is located at 170 FM 544 Suite 102, Murphy, TX, 75094, in Collin County.
Who is the owner or developer of Wingstop?
Murphy Crossing Dallas, TX. LLC is the property owner/developer of record for Wingstop, per its TDLR project registration.
Who is the architect or design firm for Wingstop?
Kolbrook Design is the design firm of record for Wingstop, according to its TDLR filing.
How much does Wingstop cost and how big is it?
Wingstop has an estimated construction value of $175K and approximately 1,335 square feet (about $131/sqft), based on its TDLR filing.
๐Scope of Work
1,335 sf Renovation & new finishes throughout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 9, 2024
Review Complete
Inspection Complete
Closed
Oct 14, 2024