๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

LISD Mechanic Shop

109 S. West Drive, Leander, TX 78641, Leander, TX, 78641
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024023328
$8.4M
Project Value
8,200
Square Feet
$1.02K/sqft
Cost/SqFt
11 months
Duration
Registered:Jul 18, 2024
Start:Oct 16, 2024
Target:Sep 11, 2025
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

CONSTRUCTION OF A NEW 8200sf MECHANIC SHOP FOR LISD. SITEWORK TO INVOLVE REMOVAL AND REPLACING EXISTING PAVING, NEW FENCES AND GATES. DEMOLITION AND REMOVAL OF EXISTING BUILDING

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 18, 2024
Project Closed
September 11, 2025
Construction Start
October 16, 2024
Expected Completion
September 11, 2025

๐Ÿ“Location & Views

Open in MapsGet Directions|30.57757, -97.85589

๐Ÿ“„Related City Permits

Building permits found at or near this location

10900 SAGE OAK CV
11.96 mi away

Installation of a 200A Service-Rated Automatic Transfer Switch 22kW whole home generator additional grounding and type 2 surge protection.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-019952 EP
๐Ÿ”งNomic Energy LLC DBA Nomic Power Solutions
10902 CUT PLAINS LOOP
12.10 mi away

Install Level 2 EV Charger

FinalElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-017415 EP
๐Ÿ”งCharge Pro LLC
10901 CATTHORN CV
12.30 mi away

(Reason George) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP

ActiveElectrical PermitSpecial Inspections ProgramFeb 2026
View Details
2026-018139 EP
๐Ÿ”งSMART CHARGE RESIDENTAL LLC
10901 N LAMAR BLVD BLDG A
17.02 mi away

Tis is a commercial shopping center one of the strips has a transformer that feeds a 36 x36 jbox with tap blocks inside. there are 6 meter banks that have feeder from the tap blocks to each meter then there respective disconnects. One of the A phase has melted insulation due to overload or deterioation of the insulation. This is an emergency requuest due to if the bare phase touches any metal parts and arc fault explosion can take place the likelyhood is high. Please approve this request high priority. I will have to coordinate with Autin Energy to do after hrs. Time sensitive. High danger.

ActiveElectrical PermitRepairFeb 2026
View Details
2026-015956 EP
๐Ÿ”งElectric Contractors LLC
10906 WAREHAM CT
26.91 mi away

Replacement of an existing water heater replacing an existing 40 gallon gas water heater like for like

FinalPlumbing PermitChange OutFeb 2026
View Details
2026-015381 PP
๐Ÿ”งBenjamin Franklin Plumbing

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists