Project intelligenceTDLR TABS2024023624Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

HMWB SP2 SPD Reactivation

18220 Tomball Parkway, Houston, TX, 77070

Construction complete · Aug 2026Project Closed

HMWB SP2 SPD Reactivation is a renovation/alteration project at 18220 Tomball Parkway, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $1.1M across about 1,385 sq ft.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,385 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$758/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 22, 2024760 days across supplied datesAug 21, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    438 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    127 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77070 (Houston)

One email per change. Unsubscribe in one click. Privacy.

HMWB SP2 SPD Reactivation is a Renovation/Alteration project located at 18220 Tomball Parkway, Houston, TX 77070 in Houston, Texas. The project has an estimated value of $1.1M covering 1,385 sq ft. Houston Methodist Willowbrook is the property owner and C/V Architects is the design firm of record. The project was registered with TDLR on July 22, 2024.

Frequently Asked Questions

What is HMWB SP2 SPD Reactivation?

HMWB SP2 SPD Reactivation is a renovation/alteration project at 18220 Tomball Parkway in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of the existing Sterile Processing Department at Houston Methodist Willowbrook South Pavilion. New decontamination, washing, and sterilizing equipment to reactivate the SPD.

Is HMWB SP2 SPD Reactivation open in Houston?

Construction on HMWB SP2 SPD Reactivation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.

Where is HMWB SP2 SPD Reactivation located?

HMWB SP2 SPD Reactivation is located at 18220 Tomball Parkway, Houston, TX, 77070, in Harris County.

Who is the owner or developer of HMWB SP2 SPD Reactivation?

Houston Methodist Willowbrook is the property owner/developer of record for HMWB SP2 SPD Reactivation, per its TDLR project registration.

Who is the architect or design firm for HMWB SP2 SPD Reactivation?

C/V Architects is the design firm of record for HMWB SP2 SPD Reactivation, according to its TDLR filing.

How much does HMWB SP2 SPD Reactivation cost and how big is it?

HMWB SP2 SPD Reactivation has an estimated construction value of $1.1M and approximately 1,385 square feet (about $758/sqft), based on its TDLR filing.

Scope of Work

Renovation of the existing Sterile Processing Department at Houston Methodist Willowbrook South Pavilion. New decontamination, washing, and sterilizing equipment to reactivate the SPD.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

18220 Tomball Parkway, Houston, TX, 77070

Location by street address

Related City Permits

Building permits found at or near this location

18220 TOMBALL (NORTH PAVILION) PKY FL 1, Houston, TX 77070

382 SF HOSPITAL REMODEL 1-7-1-I2-A '21 IBC SPK/FA

IssuedBuilding PmtJan 2026
HOU-25071291-BUILDINGPMT
18220 TOMBALL (NORTH PAVILION) PKY FL 2, Houston, TX 77070

1805 SF HOSPITAL REMODEL 1-7-1-I2-A SPK '21 IBC

IssuedBuilding PmtJan 2026
HOU-25101320-BUILDINGPMT

Watch all construction in 77070 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Harris

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists