Project intelligenceTDLR TABS2024023867Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

FedEx Employee Entrance

840 W. Sandy Lake Road 840 W. Sandy Lake Road, Coppell, TX, Coppell, TX, 75019

Target date passed (Jul 2025)Review Complete

FedEx Employee Entrance is a renovation/alteration project at 840 W. Sandy Lake Road 840 W. Sandy Lake Road, Coppell, TX, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $335K across about 5,600 sq ft.

Estimated project value
$335K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$60/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 24, 2024342 days across supplied datesJul 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    162 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    180 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75019 (Coppell)

One email per change. Unsubscribe in one click. Privacy.

FedEx Employee Entrance is a Renovation/Alteration project located at 840 W. Sandy Lake Road 840 W. Sandy Lake Road, Coppell, TX, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $335K covering 5,600 sq ft. FedEx is the property owner and GPF Architects is the design firm of record. The project was registered with TDLR on July 24, 2024.

Frequently Asked Questions

What is FedEx Employee Entrance?

FedEx Employee Entrance is a renovation/alteration project at 840 W. Sandy Lake Road 840 W. Sandy Lake Road, Coppell, TX in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing space

Is FedEx Employee Entrance open in Coppell?

FedEx Employee Entrance was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is FedEx Employee Entrance located?

FedEx Employee Entrance is located at 840 W. Sandy Lake Road 840 W. Sandy Lake Road, Coppell, TX, Coppell, TX, 75019, in Dallas County.

Who is the owner or developer of FedEx Employee Entrance?

FedEx is the property owner/developer of record for FedEx Employee Entrance, per its TDLR project registration.

Who is the architect or design firm for FedEx Employee Entrance?

GPF Architects is the design firm of record for FedEx Employee Entrance, according to its TDLR filing.

How much does FedEx Employee Entrance cost and how big is it?

FedEx Employee Entrance has an estimated construction value of $335K and approximately 5,600 square feet (about $60/sqft), based on its TDLR filing.

Scope of Work

Interior renovation of existing space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 75019 (Coppell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Dallas

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists