Water & Wastewater Group A Phase 3 - Package 1
Water & Wastewater Group A Phase 3 - Package 1 is a renovation/alteration project at 4906 Braeburn Dr, Bellaire, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $110K across about 17,400 sq ft.
๐Project Metrics
TDLR #TABS2024024730Project Registered
Project has been registered with TDLR and is in pre-construction phase
Water & Wastewater Group A Phase 3 - Package 1 is a Renovation/Alteration project located at 4906 Braeburn Dr, Bellaire, TX 77401 in Bellaire, Texas. The project has an estimated value of $110K covering 17,400 sq ft. City of Bellaire is the property owner and ARKK Engineers is the design firm of record. The project was registered with TDLR on August 5, 2024.
โFrequently Asked Questions
What is Water & Wastewater Group A Phase 3 - Package 1?
Water & Wastewater Group A Phase 3 - Package 1 is a renovation/alteration project at 4906 Braeburn Dr in Bellaire, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal and replacement of existing sidewalk to facilitate waterline construction.
Is Water & Wastewater Group A Phase 3 - Package 1 open in Bellaire?
Water & Wastewater Group A Phase 3 - Package 1 is currently under construction in Bellaire, TX. Its current TDLR status is "Project Registered".
Where is Water & Wastewater Group A Phase 3 - Package 1 located?
Water & Wastewater Group A Phase 3 - Package 1 is located at 4906 Braeburn Dr, Bellaire, TX, 77401, in Harris County.
Who is the owner or developer of Water & Wastewater Group A Phase 3 - Package 1?
City of Bellaire is the property owner/developer of record for Water & Wastewater Group A Phase 3 - Package 1, per its TDLR project registration.
Who is the architect or design firm for Water & Wastewater Group A Phase 3 - Package 1?
ARKK Engineers is the design firm of record for Water & Wastewater Group A Phase 3 - Package 1, according to its TDLR filing.
How much does Water & Wastewater Group A Phase 3 - Package 1 cost and how big is it?
Water & Wastewater Group A Phase 3 - Package 1 has an estimated construction value of $110K and approximately 17,400 square feet (about $6/sqft), based on its TDLR filing.
๐Scope of Work
Removal and replacement of existing sidewalk to facilitate waterline construction.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2024
Review Complete
Inspection Complete
Closed