Ready Suite 525
Ready Suite 525 is a renovation/alteration project at 3151 Briarpark, Floor 5, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2024). The project has an estimated value of $175K across about 3,475 sq ft.
๐Project Metrics
TDLR #TABS2024024772Project Closed
Project has been completed and closed
Ready Suite 525 is a Renovation/Alteration project located at 3151 Briarpark, Floor 5, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $175K covering 3,475 sq ft. GPI Briarpark Green LP is the property owner and Lamoureux Design Studio is the design firm of record. The project was registered with TDLR on August 6, 2024.
โFrequently Asked Questions
What is Ready Suite 525?
Ready Suite 525 is a renovation/alteration project at 3151 Briarpark, Floor 5 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: office remodel
Is Ready Suite 525 open in Houston?
Construction on Ready Suite 525 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2024. The building is finished and very likely open.
Where is Ready Suite 525 located?
Ready Suite 525 is located at 3151 Briarpark, Floor 5, Houston, TX, 77042, in Harris County.
Who is the owner or developer of Ready Suite 525?
GPI Briarpark Green LP is the property owner/developer of record for Ready Suite 525, per its TDLR project registration.
Who is the architect or design firm for Ready Suite 525?
Lamoureux Design Studio is the design firm of record for Ready Suite 525, according to its TDLR filing.
How much does Ready Suite 525 cost and how big is it?
Ready Suite 525 has an estimated construction value of $175K and approximately 3,475 square feet (about $50/sqft), based on its TDLR filing.
๐Scope of Work
office remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 6, 2024
Review Complete
Inspection Complete
Closed
Dec 31, 2024