Funding type
This project is privately funded, on private land for private use.
KELSEY SEYBOLD MEMORIAL CITY 15 TI in Houston, TX
929 GESSNER ROAD, SUITE 1500, Houston, TX, 77024
KELSEY SEYBOLD MEMORIAL CITY 15 TI is a renovation/alteration project at 929 GESSNER ROAD, SUITE 1500, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2025). The project has an estimated value of $4.1M across about 26,320 sq ft.
- Estimated project value
- $4.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 26,320 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $156/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
62 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
322 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About KELSEY SEYBOLD MEMORIAL CITY 15 TI
Kelsey Seybold Memorial City 15 TI is a $4,100,000 renovation of 26,320 sq ft of interior space on the 15th floor of Memorial Hermann Tower at 929 Gessner Road in Houston. The project involved an interior buildout of an outpatient clinic within existing building space, with no exterior or site work included in the scope. The TDLR record for this construction was closed in August 2025.
The renovation was executed by Metro National dba MC Medical Campus LP, the owner of record. Powers Brown Architecture served as the design firm, while Ernest G Taylor acted as the registered accessibility specialist. The work began in October 2024 and was scheduled for completion by August 2025. The filing explicitly notes that the project is privately funded on private land for private use.
Project Scale and Cost
The estimated cost of $4,100,000 places Kelsey Seybold Memorial City 15 TI above the median estimated cost for similar projects in Harris County. The county median for renovation and alteration filings is $250,000, with the middle half ranging from $126,522 to $600,000. This project’s cost is in the top quarter of the county data. The size of 26,320 sq ft is significantly larger than the county median of 4,000 sq ft for this type of work.
The cost per square foot for this buildout was $156. This figure is above the county median of $80 per square foot for renovation and alteration projects. The scheduled build window was 322 days, which is longer than the county median of 92 days for similar filings. These metrics reflect the complexity and scale of an outpatient clinic buildout within a high-rise medical tower.
Local Context and Records
The project is located in the Memorial City area of Harris County. Other registered projects in the same area include the Memorial Hermann Memorial City Medical Center and Elite Dermatology Memorial. Powers Brown Architecture has six other TDLR-registered projects totaling $8,308,825, including work in Katy, Houston, and Leander. City of Houston permit records show two building permits on file at this street address, issued between March 2026 and March 2026. These permits describe hospital equipment remodels, indicating continued activity at the location following the main construction phase.
TDLR closed the project file in August 2025, which marks the end of the accessibility review process for Kelsey Seybold Memorial City 15 TI. The status is listed as Project Closed. No further construction updates are recorded in the TDLR system for this specific filing. The area profile for ZIP code 77024 shows a median household income of $142,039 and a median owner-occupied home value of $1,164,400, according to U.S. Census ACS 2023 five-year estimates.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77024 (Houston)
One email per change. Unsubscribe in one click. Privacy.
KELSEY SEYBOLD MEMORIAL CITY 15 TI is a Renovation/Alteration project located at 929 GESSNER ROAD, SUITE 1500, Houston, TX 77024 in Houston, Texas. The project has an estimated value of $4.1M covering 26,320 sq ft. Metro National dba MC Medical Campus LP is the property owner and POWERS BROWN ARCHITECTURE is the design firm of record. The project was registered with TDLR on August 6, 2024.
Frequently Asked Questions
Is the Kelsey Seybold Clinic open?
The TDLR record confirms the construction project was closed in August 2025. This status reflects the completion of the accessibility review and construction phase. It does not independently confirm current business operating hours or public opening status.
Who designed the clinic renovation?
Powers Brown Architecture was the design firm of record for the project. They worked with Metro National dba MC Medical Campus LP, the owner of record, to complete the interior buildout.
How big is the renovated space?
The renovation covered 26,320 sq ft of interior space on the 15th floor of Memorial Hermann Tower. This is significantly larger than the county median of 4,000 sq ft for similar renovation filings in Harris County.
What was the estimated cost?
The estimated cost for the project was $4,100,000. This amount is above the median estimated cost of $250,000 for renovation and alteration projects in Harris County, placing it in the top quarter of filings.
When did construction finish?
Construction was scheduled to finish in August 2025. The TDLR record shows the project file was closed in August 2025, marking the end of the accessibility review process for this construction.
What is KELSEY SEYBOLD MEMORIAL CITY 15 TI?
KELSEY SEYBOLD MEMORIAL CITY 15 TI is a renovation/alteration project at 929 GESSNER ROAD, SUITE 1500 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILDOUT OF AN OUTPATIENT CLINIC OF existing INTERIOR SPACE LOCATED ON THE 15th floor OF AN EXISTING BUILDING. NO EXTERIOR OR SITE WORK BEING DONE.
Is KELSEY SEYBOLD MEMORIAL CITY 15 TI open in Houston?
Construction on KELSEY SEYBOLD MEMORIAL CITY 15 TI is complete — TDLR records show the project passed its required accessibility inspection in Aug 2025. The building is finished and very likely open.
Where is KELSEY SEYBOLD MEMORIAL CITY 15 TI located?
KELSEY SEYBOLD MEMORIAL CITY 15 TI is located at 929 GESSNER ROAD, SUITE 1500, Houston, TX, 77024, in Harris County.
Who is the owner or developer of KELSEY SEYBOLD MEMORIAL CITY 15 TI?
Metro National dba MC Medical Campus LP is the property owner/developer of record for KELSEY SEYBOLD MEMORIAL CITY 15 TI, per its TDLR project registration.
Who is the architect or design firm for KELSEY SEYBOLD MEMORIAL CITY 15 TI?
POWERS BROWN ARCHITECTURE is the design firm of record for KELSEY SEYBOLD MEMORIAL CITY 15 TI, according to its TDLR filing.
How much does KELSEY SEYBOLD MEMORIAL CITY 15 TI cost and how big is it?
KELSEY SEYBOLD MEMORIAL CITY 15 TI has an estimated construction value of $4.1M and approximately 26,320 square feet (about $156/sqft), based on its TDLR filing.
Scope of Work
INTERIOR BUILDOUT OF AN OUTPATIENT CLINIC OF existing INTERIOR SPACE LOCATED ON THE 15th floor OF AN EXISTING BUILDING. NO EXTERIOR OR SITE WORK BEING DONE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
929 GESSNER ROAD, SUITE 1500, Houston, TX, 77024
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Related City Permits
Building permits found at or near this location
926 SF HOSPITAL EQUIPMENT REMODEL 1-33-1-I2-A 21 IBC
698 SF HOSPITAL EQUIPMENT REMODEL 1-33-1-I2-A 21 IBC 100% NFPA13
9,157 SQ. FT. HI-RISE OFFICE REMODEL 1-33-1-B-A 100%SPK/FA '21 IBC
Watch all construction in 77024 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.