Mercer St Sidewalks in Dripping Springs, TX
From RM 12 to Rob Shelton Blvd, Dripping Springs, TX, 78620
Mercer St Sidewalks is a new construction project at From RM 12 to Rob Shelton Blvd, Dripping Springs, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2025). The project has an estimated value of $630K across about 8,700 sq ft.
- Estimated project value
- $630K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 8,700 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $72/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
211 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
127 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
📰About Mercer St Sidewalks
The Mercer St Sidewalks project in Dripping Springs is complete, having passed its final TDLR accessibility inspection in July 2025. This new construction effort built 1,450 linear feet of sidewalk along Mercer Street, spanning the segment from RM 12 to Rob Shelton Blvd. The City of Dripping Springs is the owner of record for this infrastructure improvement, which covers a total area of 8,700 square feet.
Freese and Nichols served as the design firm of record for the project. The estimated cost was $630,000, which calculates to a cost of $72 per square foot. This figure is below the median cost per square foot for similar new construction filings in Hays County. The scheduled build window was 127 days, a duration shorter than the 274-day median for comparable projects in the county.
The project was registered with the Texas Department of Licensing and Regulation in August 2024. Construction began in March 2025, and the work concluded with the final inspection in July 2025. Frank Fonseca is listed as the registered accessibility specialist for this filing. The project involves public funds and public land, consistent with municipal infrastructure standards.
Regional Context and Ownership
The City of Dripping Springs has six other TDLR-registered projects on record, with a combined value of $13,353,638. These include the Mercer Street Paseo and the Dripping Springs Ranch Park and Event Center. Freese and Nichols has designed six other registered projects totaling $28,814,266, including developments in Brownwood and Dallas. This indicates a consistent partnership between the city and the design firm for various local improvements.
Dripping Springs is located in Hays County, with a ZIP code 78620 population of approximately 20,624 people according to U.S. Census estimates. The median household income in this area is $146,551. The Mercer St Sidewalks project fits within a broader pattern of municipal development in the region, where the city continues to invest in public infrastructure and accessibility compliance. The project is one of several new construction filings in the immediate area, reflecting ongoing growth and development in the community.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78620 (Dripping Springs)
One email per change. Unsubscribe in one click. Privacy.
Mercer St Sidewalks is a New Construction project located at From RM 12 to Rob Shelton Blvd, Dripping Springs, TX 78620 in Dripping Springs, Texas. The project has an estimated value of $630K covering 8,700 sq ft. City of Dripping Springs is the property owner and Freese and Nichols is the design firm of record. The project was registered with TDLR on August 12, 2024.
Frequently Asked Questions
Is the Mercer St Sidewalks project finished?
Yes, the project passed its final TDLR accessibility inspection in July 2025. Construction is complete, and the 1,450 linear feet of sidewalk along Mercer Street are built.
Who designed the Mercer St Sidewalks?
Freese and Nichols is the design firm of record for this project. They are responsible for the design of the 1,450 linear feet of new sidewalk construction.
How much did the Mercer St Sidewalks cost?
The estimated cost for the project was $630,000. This covers the construction of 8,700 square feet of sidewalk along Mercer Street in Dripping Springs.
Who owns the Mercer St Sidewalks project?
The City of Dripping Springs is the owner and developer of record. The project involves public funds and public land within the city limits.
When was the Mercer St Sidewalks project registered?
The project was registered with the Texas Department of Licensing and Regulation in August 2024. Construction started in March 2025 and concluded in July 2025.
What is Mercer St Sidewalks?
Mercer St Sidewalks is a new construction project at From RM 12 to Rob Shelton Blvd in Dripping Springs, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct 1450 LF of 6 sidewalk along Mercer St.
Is Mercer St Sidewalks open in Dripping Springs?
Construction on Mercer St Sidewalks is complete — TDLR records show the project passed its required accessibility inspection in Jul 2025. The building is finished and very likely open.
Where is Mercer St Sidewalks located?
Mercer St Sidewalks is located at From RM 12 to Rob Shelton Blvd, Dripping Springs, TX, 78620, in Hays County.
Who is the owner or developer of Mercer St Sidewalks?
City of Dripping Springs is the property owner/developer of record for Mercer St Sidewalks, per its TDLR project registration.
Who is the architect or design firm for Mercer St Sidewalks?
Freese and Nichols is the design firm of record for Mercer St Sidewalks, according to its TDLR filing.
How much does Mercer St Sidewalks cost and how big is it?
Mercer St Sidewalks has an estimated construction value of $630K and approximately 8,700 square feet (about $72/sqft), based on its TDLR filing.
Scope of Work
Construct 1450 LF of 6 sidewalk along Mercer St.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From RM 12 to Rob Shelton Blvd, Dripping Springs, TX, 78620
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$21.6M totalWatch all construction in 78620 (Dripping Springs)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dripping Springs?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.