Project intelligenceTDLR TABS2024025243New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center

510 Stadium Drive, Garland, TX, 75040

Target date passed (Aug 2026)Review Complete

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center is a new construction project at 510 Stadium Drive, Garland, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $26.0M across about 80,835 sq ft.

Estimated project value
$26.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,835 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$322/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 12, 2024719 days across supplied datesAug 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    669 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center

Garland High School is the site of an 80,835 sq ft fieldhouse and multi-program activity center at 510 Stadium Drive in Garland, Texas. The project, filed as Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center, includes new construction with multi-sport locker rooms, coaches’ offices, and support spaces. An indoor multi-program activity practice turf facility is part of the scope, along with site exterior improvements including parking and fire lanes. The estimated cost for this new construction project is $26,000,000.

The registered accessibility specialist for the project is Glenn Thomas Comtois. PBK Architects, Inc. is the design firm of record. TDLR completed plan review in August 2024. Construction was scheduled to begin in October 2024 and finish in August 2026. The TDLR status is Review Complete, but the agency has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.

Project Scale and Cost

The project cost is above the county median for new construction in Dallas County. The median estimated cost for similar filings in the county is $950,000. The scheduled build window for this project is 669 days, which is longer than the county median of 243 days. The cost per square foot is $322, which is above the county median of $125 per square foot. These figures are computed from 8,276 TDLR-registered new construction filings in Dallas County.

Garland ISD has six other TDLR-registered projects totaling $54,000,000. These include three buildings at the Carson-Mulkey Agricultural Science Center in Sachse, the Williams High School Stadium in Garland, and North Garland HS in Garland. All six projects have a review complete status. PBK Architects, Inc. has six other TDLR-registered projects totaling $86,953,483, including Little Elm High School and projects in Houston and Wylie.

Area Context

The project is located in ZIP code 75040 in Dallas County. U.S. Census ACS 2023 five-year estimates for this area show a population of about 64,205. The median household income is $73,537, and the median owner-occupied home value is $245,400. Housing in the area is mostly owner-occupied, with 21,629 housing units. The Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75040 (Garland)

One email per change. Unsubscribe in one click. Privacy.

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center is a New Construction project located at 510 Stadium Drive, Garland, TX 75040 in Garland, Texas. The project has an estimated value of $26.0M covering 80,835 sq ft. Garland ISD is the property owner and PBK Architects, Inc. is the design firm of record. The project was registered with TDLR on August 12, 2024.

Frequently Asked Questions

Is the Garland High School fieldhouse open?

The TDLR record shows the project has not yet recorded a final inspection. Construction was scheduled to finish in August 2026, but the current state of the site is not confirmed in the public record.

Who is the design firm for the Garland High School fieldhouse?

PBK Architects, Inc. is the design firm of record for the Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center project.

What is the estimated cost of the Garland High School fieldhouse?

The estimated cost for the new construction project is $26,000,000. This figure is above the median estimated cost for new construction filings in Dallas County.

What is the square footage of the Garland High School fieldhouse?

The project is 80,835 sq ft. This includes the fieldhouse, multi-sport locker rooms, coaches’ offices, and an indoor multi-program activity practice turf facility.

When was plan review completed for the Garland High School fieldhouse?

TDLR completed plan review in August 2024. The project was registered with TDLR in August 2024, and construction was scheduled to start in October 2024.

What is Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center?

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center is a new construction project at 510 Stadium Drive in Garland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 80,835 SF / Fieldhouse with multi-sport locker rooms, coaches’ offices and support spaces with an indoor multi-program activity practice turf facility and site exterior improvements including parking and fire lanes.

Is Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center open in Garland?

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center located?

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center is located at 510 Stadium Drive, Garland, TX, 75040, in Dallas County.

Who is the owner or developer of Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center?

Garland ISD is the property owner/developer of record for Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center, per its TDLR project registration.

Who is the architect or design firm for Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center?

PBK Architects, Inc. is the design firm of record for Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center, according to its TDLR filing.

How much does Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center cost and how big is it?

Garland ISD PH1BP02 Fieldhouse and Multi-Program Activity Center has an estimated construction value of $26.0M and approximately 80,835 square feet (about $322/sqft), based on its TDLR filing.

Scope of Work

80,835 SF / Fieldhouse with multi-sport locker rooms, coaches’ offices and support spaces with an indoor multi-program activity practice turf facility and site exterior improvements including parking and fire lanes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

510 Stadium Drive, Garland, TX, 75040

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75040 (Garland)