Project intelligenceTDLR TABS2024025676Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

FINISH-OUT FOR CAPTUREPOINT LLC in Allen, TX

1101 CENTRAL EXPRESSWAY SOUTH SUITE 270, Allen, TX, 75013

Construction complete · Oct 2024Project Closed

FINISH-OUT FOR CAPTUREPOINT LLC is a renovation/alteration project at 1101 CENTRAL EXPRESSWAY SOUTH SUITE 270, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $225K across about 3,845 sq ft.

Estimated project value
$225K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,845 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$59/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 16, 202473 days across supplied datesOct 28, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75013 (Allen)

One email per change. Unsubscribe in one click. Privacy.

FINISH-OUT FOR CAPTUREPOINT LLC is a Renovation/Alteration project located at 1101 CENTRAL EXPRESSWAY SOUTH SUITE 270, Allen, TX 75013 in Allen, Texas. The project has an estimated value of $225K covering 3,845 sq ft. 1101 SCE, LLC is the property owner and HALBACH DIETZ ARCHITECTS is the design firm of record. The project was registered with TDLR on August 16, 2024.

Frequently Asked Questions

What is FINISH-OUT FOR CAPTUREPOINT LLC?

FINISH-OUT FOR CAPTUREPOINT LLC is a renovation/alteration project at 1101 CENTRAL EXPRESSWAY SOUTH SUITE 270 in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL OF EXISTING LEASE SPACE

Is FINISH-OUT FOR CAPTUREPOINT LLC open in Allen?

Construction on FINISH-OUT FOR CAPTUREPOINT LLC is complete — TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.

Where is FINISH-OUT FOR CAPTUREPOINT LLC located?

FINISH-OUT FOR CAPTUREPOINT LLC is located at 1101 CENTRAL EXPRESSWAY SOUTH SUITE 270, Allen, TX, 75013, in Collin County.

Who is the owner or developer of FINISH-OUT FOR CAPTUREPOINT LLC?

1101 SCE, LLC is the property owner/developer of record for FINISH-OUT FOR CAPTUREPOINT LLC, per its TDLR project registration.

Who is the architect or design firm for FINISH-OUT FOR CAPTUREPOINT LLC?

HALBACH DIETZ ARCHITECTS is the design firm of record for FINISH-OUT FOR CAPTUREPOINT LLC, according to its TDLR filing.

How much does FINISH-OUT FOR CAPTUREPOINT LLC cost and how big is it?

FINISH-OUT FOR CAPTUREPOINT LLC has an estimated construction value of $225K and approximately 3,845 square feet (about $59/sqft), based on its TDLR filing.

Scope of Work

REMODEL OF EXISTING LEASE SPACE

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1101 CENTRAL EXPRESSWAY SOUTH SUITE 270, Allen, TX, 75013

Location by street address

Watch all construction in 75013 (Allen)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.