Moca World Headquarters
๐Project Metrics
TDLR #TABS2024025906Review Complete
Design review complete, construction may proceed
๐Scope of Work
One Story Office building including entry road with parking
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
excavation of two tunnels to identify and rectify defects in the drainage system. The first tunnel will be constructed from the front yard following the cleanout and will extend 5 feet beneath the house to expose a break in the wye off the main drainage line. The second tunnel will be excavated from the left side of the house extending 5 feet to expose the bend in the hall toilet.
Express: Foundation Repair
Replace the sanitary sewer line for the clothes washer. We will route it thru the exterior wall down to under ground across the yard and connect to the sanitary sewer yard line. About 40 ft. In the back yard.
Excavate 20 tunnel to repair main drain line under house
Requesting disconnect for main panel upgrade. No meter can replacement.