Project intelligenceTDLR TABS2024026227Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Bruckner's Renovation in Wichita Falls, TX

4520 NW Freeway, Wichita Falls, TX, 76306

Construction complete · Feb 2026Inspection Complete

Bruckner's Renovation is a renovation/alteration project at 4520 NW Freeway, Wichita Falls, in Wichita County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $500K across about 650 sq ft.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
650 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$769/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 26, 2024548 days across supplied datesFeb 25, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    330 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Bruckner's Renovation

Bruckner's Renovation at 4520 NW Freeway in Wichita Falls is complete. The project, registered with TDLR in August 2024, added 650 square feet of new space to the existing facility. The work included the construction of new restrooms and a tool room, along with the installation of exterior canopies over the overhead doors.

The building passed its final TDLR accessibility inspection in February 2026, confirming that all construction activities have concluded. The owner of record, Bruckners Truck Sales Inc, undertook this renovation and alteration on private land. The project was privately funded for private use, with an estimated cost of $500,000.

Project Scope and Cost

The renovation focused on functional improvements to the site at 4520 NW Freeway. The scope of work specified in the filing was limited to the addition of restrooms and a tool room, as well as the exterior canopies. The total estimated cost of $500,000 translates to $769 per square foot for the 650 square feet of added space.

Compared to other renovation and alteration filings in Wichita County, this project's cost is above the county median of $250,000. The scheduled build window of 182 days was longer than the county median of 121 days. The cost per square foot of $769 is significantly above the county median of $74 per square foot for similar projects.

Timeline and Registration

Michael J Love served as the registered accessibility specialist for this project. Plan review was completed in August 2024, the same month the project was registered. Construction began in October 2024. The filing indicated a completion date of April 2025, but the final inspection did not pass until February 2026.

The TDLR status for this project is Inspection Complete. This confirms that the physical alterations described in the filing are finished and have met the necessary regulatory standards. The project is located in Wichita County, within the ZIP code 76306.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76306 (Wichita Falls)

One email per change. Unsubscribe in one click. Privacy.

Bruckner's Renovation is a Renovation/Alteration project located at 4520 NW Freeway, Wichita Falls, TX 76306 in Wichita Falls, Texas. The project has an estimated value of $500K covering 650 sq ft. Bruckners Truck Sales Inc is the property owner. The project was registered with TDLR on August 26, 2024.

Frequently Asked Questions

Is the renovation at Bruckner's finished?

Yes, the project passed its final TDLR accessibility inspection in February 2026. The TDLR status is listed as Inspection Complete, indicating construction is done.

What work was done at 4520 NW Freeway?

The renovation added 650 square feet, including new restrooms and a tool room. Exterior canopies were also added at the overhead doors.

Who owns the property at 4520 NW Freeway?

The owner of record is Bruckners Truck Sales Inc. The project was privately funded on private land for private use.

How much did the Bruckner's renovation cost?

The estimated cost was $500,000. This amounts to $769 per square foot for the 650 square feet of new construction.

When did construction start and end?

Construction started in October 2024. The final TDLR accessibility inspection was passed in February 2026, marking the completion of the project.

What is Bruckner's Renovation?

Bruckner's Renovation is a renovation/alteration project at 4520 NW Freeway in Wichita Falls, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Add restrooms and a tool room. Add exterior canopies at overhead doors.

Is Bruckner's Renovation open in Wichita Falls?

Construction on Bruckner's Renovation is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.

Where is Bruckner's Renovation located?

Bruckner's Renovation is located at 4520 NW Freeway, Wichita Falls, TX, 76306, in Wichita County.

Who is the owner or developer of Bruckner's Renovation?

Bruckners Truck Sales Inc is the property owner/developer of record for Bruckner's Renovation, per its TDLR project registration.

How much does Bruckner's Renovation cost and how big is it?

Bruckner's Renovation has an estimated construction value of $500K and approximately 650 square feet (about $769/sqft), based on its TDLR filing.

Scope of Work

Add restrooms and a tool room. Add exterior canopies at overhead doors.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4520 NW Freeway, Wichita Falls, TX, 76306

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76306 (Wichita Falls)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Wichita Falls?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.