SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St in Burleson, TX

1350 SW Alsbury Blvd, Burleson, TX, 76028

Construction complete · Apr 2026Project Closed

SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St is a new construction project at 1350 SW Alsbury Blvd, Burleson, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2026). The project has an estimated value of $350K across about 35,000 sq ft.

Estimated project value
$350K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
35,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$10/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 26, 2024585 days across supplied datesApr 3, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    324 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    86 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    78 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St

The SW Alsbury Boulevard right-of-way project in Burleson is complete. This new construction effort focused on roadway, sidewalk, and curb ramp improvements along a stretch of the existing road. The project spans 35,000 square feet and was valued at an estimated $350,000.

Located at 1350 SW Alsbury Blvd, the work covers the section from CR Rd 920 to Candler Street. The City of Burleson served as the owner of record for this public infrastructure upgrade. Freese and Nichols acted as the design firm of record, overseeing the technical aspects of the roadway and accessibility improvements.

Registered with the Texas Department of Licensing and Regulation (TDLR) in August 2024, the project moved through plan review that same month. Construction began in December 2024. The filing indicated a scheduled completion date of October 2025. The final inspection passed in January 2026, confirming that the new sidewalks and curb ramps met required standards.

Project Context and Cost

At $350,000, this project's estimated cost sits below the median for new construction filings in Johnson County, which stands at $800,000. The cost per square foot is $10, significantly below the county median of $132 per square foot. The scheduled build window of 324 days is longer than the county median of 220 days, reflecting the linear nature of roadway work compared to single-structure builds.

George A Patterson served as the registered accessibility specialist for this filing. The project involved public funds and land, consistent with municipal infrastructure standards. TDLR closed the project file in April 2026, which marks the end of the accessibility review process for this construction. This closure signifies that all regulatory requirements associated with the new roadway and sidewalk elements have been satisfied.

The City of Burleson has registered six other projects with TDLR, totaling nearly $40 million in value. Freese and Nichols has also been involved in several other high-value projects across Texas, including developments in Brownwood and Dallas. This Alsbury Boulevard phase fits within a broader pattern of municipal investment in road safety and accessibility in Johnson County.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76028 (Burleson)

One email per change. Unsubscribe in one click. Privacy.

SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St is a New Construction project located at 1350 SW Alsbury Blvd, Burleson, TX 76028 in Burleson, Texas. The project has an estimated value of $350K covering 35,000 sq ft. City of Burleson is the property owner and Freese and Nichols is the design firm of record. The project was registered with TDLR on August 26, 2024.

Frequently Asked Questions

What was the scope of the SW Alsbury Boulevard project?

The project included new roadway, sidewalk, and curb ramp improvements adjacent to the existing roadway. It covered 35,000 square feet of infrastructure development in Burleson.

Who owned and designed this project?

The City of Burleson was the owner of record. Freese and Nichols served as the design firm of record for the construction.

When did construction start and finish?

Construction started in December 2024. The final inspection passed in January 2026, and TDLR closed the project file in April 2026.

How much did this project cost?

The estimated cost was $350,000. This amount is below the median cost for similar new construction projects in Johnson County.

What is SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St?

SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St is a new construction project at 1350 SW Alsbury Blvd in Burleson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New roadway, sidewalk, and curb ramp improvements adjacent to the existing roadway.

Is SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St open in Burleson?

Construction on SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St is complete — TDLR records show the project passed its required accessibility inspection in Apr 2026. The building is finished and very likely open.

Where is SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St located?

SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St is located at 1350 SW Alsbury Blvd, Burleson, TX, 76028, in Johnson County.

Who is the owner or developer of SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St?

City of Burleson is the property owner/developer of record for SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St, per its TDLR project registration.

Who is the architect or design firm for SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St?

Freese and Nichols is the design firm of record for SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St, according to its TDLR filing.

How much does SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St cost and how big is it?

SW Alsbury Boulevard - Phase 1B - CR Rd 920 to Candler St has an estimated construction value of $350K and approximately 35,000 square feet (about $10/sqft), based on its TDLR filing.

Scope of Work

New roadway, sidewalk, and curb ramp improvements adjacent to the existing roadway.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1350 SW Alsbury Blvd, Burleson, TX, 76028

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76028 (Burleson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Burleson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.