Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
IAH Terminal E United Fit out
3780 North Terminal Road, Houston, TX, 77032
IAH Terminal E United Fit out is a renovation/alteration project at 3780 North Terminal Road, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $1.8M across about 21,870 sq ft.
- Estimated project value
- $1.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 21,870 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $82/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
35 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
123 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
367 days after the preceding date shown.
Source: TDLR filing
View source record
📰About IAH Terminal E United Fit out
United Airlines Terminal E underwent a $1,800,000 renovation at 3780 North Terminal Road in Houston, covering 21,870 square feet of interior space. The project, filed as IAH Terminal E United Fit out, focused on the Level 2 mezzanine and surrounding areas within the terminal. Construction concluded in February 2026 when the building passed its final TDLR accessibility inspection.
The scope of work included the buildout of one office area, one break room, and two restrooms within the Level 2 mezzanine. Additional work involved miscellaneous architectural, mechanical, electrical, and technology upgrades throughout United Airlines areas on Levels 1 and 2, as well as the mezzanine where indicated. This renovation altered the existing facility rather than adding new structural footprint.
Project Details and Cost
At an estimated cost of $1,800,000, the project cost $82 per square foot. This figure is close to the Harris County median of $80 per square foot for similar renovation filings. However, the total cost places this project in the top quarter of estimated costs for renovation and alteration work in the county, where the median estimated cost is $250,000. The scheduled build window of 123 days was longer than the county median of 92 days.
Houston Airport System served as the owner of record for this project. Page Southerland Page, Inc. was the design firm of record. Kam-hung Kenneth Woo was the registered accessibility specialist. The project was registered with TDLR in August 2024, with plan review completed the same month. Construction started in October 2024.
This project is one of several recent filings by Houston Airport System in Harris County. The owner has six other TDLR-registered projects totaling $1,812,850, including work on George Bush Intercontinental Airport Terminal B North and the United Airlines Catering Operations Building. Page Southerland Page, Inc. has six other TDLR-registered projects totaling $13,037,135, ranging from hospital facilities to energy corridor buildings. The project involved public funds or public land, as noted in the funding description.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77032 (Houston)
One email per change. Unsubscribe in one click. Privacy.
IAH Terminal E United Fit out is a Renovation/Alteration project located at 3780 North Terminal Road, Houston, TX 77032 in Houston, Texas. The project has an estimated value of $1.8M covering 21,870 sq ft. HOUSTON AIRPORT SYSTEM is the property owner and Page Southerland Page, Inc. is the design firm of record. The project was registered with TDLR on August 27, 2024.
Frequently Asked Questions
Is United Airlines Terminal E in Houston open?
The TDLR record confirms construction is complete and the final TDLR accessibility inspection passed in February 2026. This status verifies the renovation work is finished, but the record does not specify the current operational schedule or public access hours for the terminal.
What was the scope of the United Airlines Terminal E renovation?
The renovation included building out one office area, one break room, and two restrooms on the Level 2 mezzanine. It also involved architectural, mechanical, electrical, and technology upgrades across United areas on Levels 1, 2, and the mezzanine.
Who was the owner and design firm for this project?
Houston Airport System was the owner of record. Page Southerland Page, Inc. served as the design firm of record for the IAH Terminal E United Fit out project in Houston.
How does the cost of this project compare to other local renovations?
The $1,800,000 estimated cost is in the top quarter of Harris County renovation filings. The cost per square foot of $82 is close to the county median of $80, though the total value is significantly higher than the median estimated cost of $250,000.
When did construction start and finish for Terminal E?
Construction started in October 2024. The project passed its final TDLR accessibility inspection in February 2026, marking the completion of the renovation work as recorded by the state.
What is IAH Terminal E United Fit out?
IAH Terminal E United Fit out is a renovation/alteration project at 3780 North Terminal Road in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: buildout of 1 office area, 1 break room & 2 restrooms w/in lvl 2 mezzanine area 12. provide misc architecture, mechanical, electrical, & technology scope throughout United areas w/in Terminal E on lvl 1, 2, and lvl 2 mezzanine where indi…
Is IAH Terminal E United Fit out open in Houston?
Construction on IAH Terminal E United Fit out is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is IAH Terminal E United Fit out located?
IAH Terminal E United Fit out is located at 3780 North Terminal Road, Houston, TX, 77032, in Harris County.
Who is the owner or developer of IAH Terminal E United Fit out?
HOUSTON AIRPORT SYSTEM is the property owner/developer of record for IAH Terminal E United Fit out, per its TDLR project registration.
Who is the architect or design firm for IAH Terminal E United Fit out?
Page Southerland Page, Inc. is the design firm of record for IAH Terminal E United Fit out, according to its TDLR filing.
How much does IAH Terminal E United Fit out cost and how big is it?
IAH Terminal E United Fit out has an estimated construction value of $1.8M and approximately 21,870 square feet (about $82/sqft), based on its TDLR filing.
Scope of Work
buildout of 1 office area, 1 break room & 2 restrooms w/in lvl 2 mezzanine area 12. provide misc architecture, mechanical, electrical, & technology scope throughout United areas w/in Terminal E on lvl 1, 2, and lvl 2 mezzanine where indicated.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3780 North Terminal Road, Houston, TX, 77032
Related Projects
Same Owner
$2.1M totalWatch all construction in 77032 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.