Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
PWSM22003 Annual Mill & Overlay Program
Endicott Drive, Arlington, TX, 76118
PWSM22003 Annual Mill & Overlay Program is a renovation/alteration project at Endicott Drive, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2024). The project has an estimated value of $770K across about 64,500 sq ft.
- Estimated project value
- $770K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 64,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $12/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
316 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
34 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76118 (Arlington)
One email per change. Unsubscribe in one click. Privacy.
PWSM22003 Annual Mill & Overlay Program is a Renovation/Alteration project located at Endicott Drive, Arlington, TX 76118 in Arlington, Texas. The project has an estimated value of $770K covering 64,500 sq ft. City of Arlington is the property owner. The project was registered with TDLR on August 27, 2024.
Frequently Asked Questions
What is PWSM22003 Annual Mill & Overlay Program?
PWSM22003 Annual Mill & Overlay Program is a renovation/alteration project at Endicott Drive in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Multiple streets in the Oakbrook Addition Neighborhood will be resurfaced with a new 2" asphalt overlay. This project will remove and replace sidewalk & ADA ramps within the project limits as needed. Sidewalk replaced is at least 64,500…
Is PWSM22003 Annual Mill & Overlay Program open in Arlington?
Construction on PWSM22003 Annual Mill & Overlay Program is complete — TDLR records show the project passed its required accessibility inspection in Sep 2024. The building is finished and very likely open.
Where is PWSM22003 Annual Mill & Overlay Program located?
PWSM22003 Annual Mill & Overlay Program is located at Endicott Drive, Arlington, TX, 76118, in Tarrant County.
Who is the owner or developer of PWSM22003 Annual Mill & Overlay Program?
City of Arlington is the property owner/developer of record for PWSM22003 Annual Mill & Overlay Program, per its TDLR project registration.
How much does PWSM22003 Annual Mill & Overlay Program cost and how big is it?
PWSM22003 Annual Mill & Overlay Program has an estimated construction value of $770K and approximately 64,500 square feet (about $12/sqft), based on its TDLR filing.
Scope of Work
Multiple streets in the Oakbrook Addition Neighborhood will be resurfaced with a new 2" asphalt overlay. This project will remove and replace sidewalk & ADA ramps within the project limits as needed. Sidewalk replaced is at least 64,500 sq ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Endicott Drive, Arlington, TX, 76118
Related Projects
Same Owner
$586.6M totalWatch all construction in 76118 (Arlington)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Arlington?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.