Project intelligenceTDLR TABS2024026641New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bridge Replacement in Coleman, TX

Various Locations, Coleman, TX, 76834

Target date passed (Nov 2025)Review Complete

Bridge Replacement is a new construction project at Various Locations, Coleman, in Coleman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $76K across about 2,210 sq ft.

Estimated project value
$76K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,210 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$34/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 29, 2024456 days across supplied datesNov 28, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    186 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    270 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Bridge Replacement

The City of Coleman is executing a new construction project identified as CSJ: 0923-08-030, focused on bridge replacement with pedestrian elements. This infrastructure work is located at various sites within Coleman, Texas 76834, in Coleman County. The filing specifies an estimated cost of $76,080 for a total area of 2,210 sq ft. The project is classified as new construction and involves public funds, public land, or a Federally funded roadway project.

Project Scope and Design

Bridgefarmer and Associates, Inc. serves as the design firm of record for this initiative. The scope of work explicitly includes the replacement of the bridge structure along with associated pedestrian elements. Frank Fonseca is the registered accessibility specialist associated with the filing. The project was registered with TDLR in August 2024, and plan review was completed in the same month. Construction was scheduled to begin in March 2025, with a completion date listed for November 2025.

The estimated cost of $76,080 places this project in the bottom quarter of new construction filings in Coleman County over the last 24 months. The county median estimated cost for similar projects is $837,500, with the middle half ranging from $606,493 to $1,000,000. The median size for these projects is 9,100 sq ft, and the median cost per square foot is $79. This project’s $34 per sq ft is below the county median. The scheduled build window of 270 days is longer than the county median of 189 days.

The City of Coleman has four other TDLR-registered projects totaling $2,665,972. These include a project in Coleman valued at $865,000 with review complete, CSJ: 0923-08-042 valued at $625,972 with review complete, Press Morris Park valued at $750,000 with review complete, and 2021 Sidewalk Improvements valued at $425,000 with the project closed. The current project’s status is Review Complete, but TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record.

For context, U.S. Census ACS 2023 five-year estimates for ZIP 76834 indicate a population of about 4,861, a median household income of $51,766, and 3,041 housing units. The median owner-occupied home value is $87,600, and housing is predominantly owner-occupied. Coleman County unemployment rate (FRED, August 2026) is 4.6 percent, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76834 (Coleman)

One email per change. Unsubscribe in one click. Privacy.

Bridge Replacement is a New Construction project located at Various Locations, Coleman, TX 76834 in Coleman, Texas. The project has an estimated value of $76K covering 2,210 sq ft. City of Coleman is the property owner and Bridgefarmer and Associates, Inc. is the design firm of record. The project was registered with TDLR on August 29, 2024.

Frequently Asked Questions

What is the primary scope of work for this project?

The scope of work is bridge replacement with pedestrian elements. It is classified as new construction and involves public funds, public land, or a Federally funded roadway project.

Who is the owner and design firm for this project?

The owner of record is the City of Coleman. The design firm of record is Bridgefarmer and Associates, Inc. Frank Fonseca is the registered accessibility specialist.

What is the estimated cost and size of the project?

The estimated cost is $76,080 for a total area of 2,210 sq ft. This results in a cost of $34 per sq ft.

Is the project complete?

TDLR has not yet recorded a final inspection. The completion date on the filing is November 2025, but the current state of the site is not confirmed in the public record.

How does this project compare to other new construction in Coleman County?

The cost is below the county median for its type. The scheduled build window of 270 days is longer than the county median of 189 days. The $34 per sq ft is below the county median of $79.

What is Bridge Replacement?

Bridge Replacement is a new construction project at Various Locations in Coleman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Bridge replacement with pedestrian elements

Is Bridge Replacement open in Coleman?

Bridge Replacement was scheduled to finish construction in Nov 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Bridge Replacement located?

Bridge Replacement is located at Various Locations, Coleman, TX, 76834, in Coleman County.

Who is the owner or developer of Bridge Replacement?

City of Coleman is the property owner/developer of record for Bridge Replacement, per its TDLR project registration.

Who is the architect or design firm for Bridge Replacement?

Bridgefarmer and Associates, Inc. is the design firm of record for Bridge Replacement, according to its TDLR filing.

How much does Bridge Replacement cost and how big is it?

Bridge Replacement has an estimated construction value of $76K and approximately 2,210 square feet (about $34/sqft), based on its TDLR filing.

Scope of Work

Bridge replacement with pedestrian elements

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, Coleman, TX, 76834

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76834 (Coleman)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.