Fluence Energy Phase 2 is a renovation/alteration project at 11740 Katy Freeway, suite 1400, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $150K across about 20,083 sq ft.
Project has been completed and closed
Fluence Energy Phase 2 is a Renovation/Alteration project located at 11740 Katy Freeway, suite 1400, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $150K covering 20,083 sq ft. Energy Tower III is the property owner and n2 design studio is the design firm of record. The project was registered with TDLR on September 11, 2024.
Fluence Energy Phase 2 is a renovation/alteration project at 11740 Katy Freeway, suite 1400 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant renovation of existing office space in high-rise office building
Construction on Fluence Energy Phase 2 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.
Fluence Energy Phase 2 is located at 11740 Katy Freeway, suite 1400, Houston, TX, 77079, in Harris County.
Energy Tower III is the property owner/developer of record for Fluence Energy Phase 2, per its TDLR project registration.
n2 design studio is the design firm of record for Fluence Energy Phase 2, according to its TDLR filing.
Fluence Energy Phase 2 has an estimated construction value of $150K and approximately 20,083 square feet (about $7/sqft), based on its TDLR filing.
Interior tenant renovation of existing office space in high-rise office building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 11, 2024
Review Complete
Inspection Complete
Closed
Jan 31, 2025