Project intelligenceTDLR TABS2025001126Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Pelican Energy Partners Expansion in Houston, TX

2050 W. Sam Houston Pkwy. South, Houston, TX, 77042

Construction complete · Nov 2024Project Closed

Pelican Energy Partners Expansion is a renovation/alteration project at 2050 W. Sam Houston Pkwy. South, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2024). The project has an estimated value of $57K across about 4,339 sq ft.

Estimated project value
$57K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,339 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 17, 202466 days across supplied datesNov 22, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    52 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Pelican Energy Partners Expansion

The Two Briar Lake Plaza renovation at 2050 W. Sam Houston Pkwy. South in Houston is complete. The project, filed under the name Pelican Energy Partners Expansion, involved renovation and alteration work to an existing lease space within the building. The registered accessibility specialist for this work was Jeromy G Murphy, and the owner of record is Two Briar Lake, LP. TDLR closed the project file in November 2024, which marks the end of the accessibility review process for this construction.

The scope of work covered 4,339 square feet of interior space. The estimated cost for this specific alteration was $57,000, resulting in a cost of $13 per square foot. This figure is below the Harris County median of $80 per square foot for similar renovation and alteration filings. The scheduled build window for the project was 52 days, which is shorter than the county median of 92 days for this type of work.

The project is located in the Spring Branch West area of Harris County. It is situated on private land for private use and is privately funded. The registration with TDLR occurred in September 2024, with construction starting in October 2024. The completion date listed on the filing was November 2024. The TDLR status for this specific filing is Project Closed.

City of Houston permit records show four permits on file at this street address, issued between February 2026 and February 2026. These permits are for building modifications and demolition of interior non-load bearing walls. While these permits are associated with the same address, they may relate to other tenants or suites within the Two Briar Lake Plaza building. The specific TDLR filing for the Pelican Energy Partners Expansion does not detail the specific tenants or business operations moving into the space.

The surrounding area includes several businesses such as St Catherine of Siena Catholic Church, Gogo Charters Houston, and Server Monkey. According to U.S. Census ACS 2023 five-year estimates for ZIP code 77042, the population is about 40,725 with a median household income of $57,745. The housing stock in this area is predominantly renter-occupied, with a median owner-occupied home value of $371,300. This context helps situate the commercial renovation within the broader residential and commercial landscape of the Spring Branch West neighborhood.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77042 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Pelican Energy Partners Expansion is a Renovation/Alteration project located at 2050 W. Sam Houston Pkwy. South, Houston, TX 77042 in Houston, Texas. The project has an estimated value of $57K covering 4,339 sq ft. Two Briar Lake, LP is the property owner. The project was registered with TDLR on September 17, 2024.

Frequently Asked Questions

Is the renovation at Two Briar Lake Plaza finished?

Yes, TDLR closed the project file in November 2024. This indicates the accessibility review process for the renovation and alteration work is complete.

Who is the owner of the project?

The owner of record listed in the TDLR filing is Two Briar Lake, LP. The project is privately funded and located on private land.

What was the cost of the renovation?

The estimated cost was $57,000 for 4,339 square feet of work. This translates to $13 per square foot, which is below the Harris County median for similar projects.

When did the construction take place?

Construction started in October 2024 and the completion date on the filing was November 2024. The project was registered with TDLR in September 2024.

What is Pelican Energy Partners Expansion?

Pelican Energy Partners Expansion is a renovation/alteration project at 2050 W. Sam Houston Pkwy. South in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation/alteration work to an existing lease space

Is Pelican Energy Partners Expansion open in Houston?

Construction on Pelican Energy Partners Expansion is complete — TDLR records show the project passed its required accessibility inspection in Nov 2024. The building is finished and very likely open.

Where is Pelican Energy Partners Expansion located?

Pelican Energy Partners Expansion is located at 2050 W. Sam Houston Pkwy. South, Houston, TX, 77042, in Harris County.

Who is the owner or developer of Pelican Energy Partners Expansion?

Two Briar Lake, LP is the property owner/developer of record for Pelican Energy Partners Expansion, per its TDLR project registration.

How much does Pelican Energy Partners Expansion cost and how big is it?

Pelican Energy Partners Expansion has an estimated construction value of $57K and approximately 4,339 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Renovation/alteration work to an existing lease space

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2050 W. Sam Houston Pkwy. South, Houston, TX, 77042

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

2050 WEST SAM HOUSTON SOUTH PKY 900, Houston, TX 77042

HIRISE OFFICE RMDL (M/2) 1-19-1-B-A-SPK/FA 21 IBC

IssuedBuilding PmtFeb 2026
HOU-25120962-BUILDINGPMT
2050 WEST SAM HOUSTON SOUTH PKY 950, Houston, TX 77042

HIRISE OFFICE RMDL (2/2) 1-19-1-B-A-SPK/FA 21 IBC

IssuedBuilding PmtFeb 2026
HOU-25120963-BUILDINGPMT
2050 WEST SAM HOUSTON SOUTH PKY 900, Houston, TX 77042

DEMO OF INTERIOR NON-LOAD BEARING NON-FIRE RATED WALLS 2021 IBC

IssuedBuilding PmtFeb 2026
HOU-26009391-BUILDINGPMT
2050 WEST SAM HOUSTON SOUTH PKY 950, Houston, TX 77042

DEMO OF INTERIOR NON-LOAD BEARING NON-FIRE RATED WALLS 2021 IBC

IssuedBuilding PmtFeb 2026
HOU-26009392-BUILDINGPMT

Watch all construction in 77042 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.