Project intelligenceTDLR TABS2025001194New Construction
Funding type

This project is privately funded, on private land for private use.

CR153 Gas Station

9025 Camino Real, Uhland, TX, 78640

Target date passed (Aug 2025)Review Complete

CR153 Gas Station is a new construction project at 9025 Camino Real, Uhland, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 8,640 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,640 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$139/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 17, 2024345 days across supplied datesAug 28, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    161 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78640 (Uhland)

One email per change. Unsubscribe in one click. Privacy.

CR153 Gas Station is a New Construction project located at 9025 Camino Real, Uhland, TX 78640 in Uhland, Texas. The project has an estimated value of $1.2M covering 8,640 sq ft. Wehbe Properties is the property owner and KO Design Group LLC is the design firm of record. The project was registered with TDLR on September 17, 2024.

Frequently Asked Questions

What is CR153 Gas Station?

CR153 Gas Station is a new construction project at 9025 Camino Real in Uhland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Shell building with c store build out.

Is CR153 Gas Station open in Uhland?

CR153 Gas Station was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is CR153 Gas Station located?

CR153 Gas Station is located at 9025 Camino Real, Uhland, TX, 78640, in Hays County.

Who is the owner or developer of CR153 Gas Station?

Wehbe Properties is the property owner/developer of record for CR153 Gas Station, per its TDLR project registration.

Who is the architect or design firm for CR153 Gas Station?

KO Design Group LLC is the design firm of record for CR153 Gas Station, according to its TDLR filing.

How much does CR153 Gas Station cost and how big is it?

CR153 Gas Station has an estimated construction value of $1.2M and approximately 8,640 square feet (about $139/sqft), based on its TDLR filing.

Scope of Work

Shell building with c store build out.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9025 Camino Real, Uhland, TX, 78640

Location by street address

Related City Permits

Building permits found at or near this location

9025 RESEARCH BLVD SVRD NB UNIT 100

2ND-GENERATION TENANT IMPROVEMENT FOR A SHAVED ICE RESTAURANT INCLUDING NEW INTERIOR LAYOUT AND ASSOCIATED MECHANICAL ELECTRICAL AND PLUMBING.

ActivePlumbing PermitRemodelSep 2026
View Details
2026-088966 PP
Widener Plumbing, LLC
9025 RESEARCH BLVD SVRD NB UNIT 100

2ND-GENERATION TENANT IMPROVEMENT FOR A SHAVED ICE RESTAURANT INCLUDING NEW INTERIOR LAYOUT AND ASSOCIATED MECHANICAL ELECTRICAL AND PLUMBING.

ActiveMechanical PermitRemodelSep 2026
View Details
2026-088966 MP
Airwell Mechanical LLC
9025 RESEARCH BLVD SVRD NB UNIT 100

2ND-GENERATION TENANT IMPROVEMENT FOR A SHAVED ICE RESTAURANT INCLUDING NEW INTERIOR LAYOUT AND ASSOCIATED MECHANICAL ELECTRICAL AND PLUMBING.

ActiveElectrical PermitRemodelAug 2026
View Details
2026-088966 EP
Genuine Electrical Services
9025 RESEARCH BLVD SVRD NB UNIT 100

2ND-GENERATION TENANT IMPROVEMENT FOR A SHAVED ICE RESTAURANT INCLUDING NEW INTERIOR LAYOUT AND ASSOCIATED MECHANICAL ELECTRICAL AND PLUMBING.

ActiveBuilding PermitRemodelJul 2026
View Details
2026-088966 BP
9025 SOUTHWICK DR

express - foundation repair on a slab foundation.

FinalBuilding PermitRepairSep 2025
$1
View Details
2025-112531 BP
LevelSmart Foundation

Watch all construction in 78640 (Uhland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.