Project intelligenceTDLR TABS2025001399New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Marshall ISD Stadium Upgrades - Phase II-B

1600 Maverick Drive, Marshall, TX, 75670

Construction complete · Sep 2026Inspection Complete

Marshall ISD Stadium Upgrades - Phase II-B is a new construction project at 1600 Maverick Drive, Marshall, in Harrison County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $3.0M across about 3,400 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$882/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 19, 2024714 days across supplied datesSep 3, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    422 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Marshall ISD Stadium Upgrades - Phase II-B

The Marshall ISD Stadium Upgrades - Phase II-B project at 1600 Maverick Drive in Marshall, Texas, has passed its final TDLR accessibility inspection. Construction is complete, with the final inspection recorded in September 2026. The project involved new construction of a concession stand and home restrooms, updates to visitor restrooms, and new fencing, totaling 3,400 square feet.

Project Scope and Cost

Marshall Independent School District is the owner of record for this $3,000,000 project. The estimated cost of $882 per square foot is above the Harrison County median of $166 per square foot for new construction filings. The scheduled build window was 273 days, which is longer than the county median of 212 days. The project was registered with TDLR in September 2024, and plan review was completed in the same month.

Goodwin-Lasiter-Strong served as the design firm of record. Melisa R Chapman was the registered accessibility specialist. This project is one of five other TDLR-registered projects for Marshall Independent School District, which collectively total $43,319,000 in estimated costs.

Local Context and Labor Market

Marshall is in Harrison County, where the unemployment rate was 5.2 percent in July 2026, higher than a year earlier. The ZIP code 75670 has a population of about 18,549, with a median household income of $39,748. Median owner-occupied home value is $100,300, and housing is mostly owner-occupied. These Census estimates provide context for the local market in which the stadium upgrades were built.

A third-party listing on projects.constructconnect.com described the project as site work and new construction of a stadium in Marshall, Texas, noting that completed plans called for the construction of the facility. This aligns with the TDLR record, which confirms the scope included new concession stand and restroom construction. The project’s completion status is verified by the final TDLR accessibility inspection, ensuring it meets state accessibility standards.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75670 (Marshall)

One email per change. Unsubscribe in one click. Privacy.

Marshall ISD Stadium Upgrades - Phase II-B is a New Construction project located at 1600 Maverick Drive, Marshall, TX 75670 in Marshall, Texas. The project has an estimated value of $3.0M covering 3,400 sq ft. Marshall Independent School District is the property owner and Goodwin-Lasiter-Strong is the design firm of record. The project was registered with TDLR on September 19, 2024.

Frequently Asked Questions

Is the Marshall ISD Stadium open?

The TDLR record confirms construction is complete and the final TDLR accessibility inspection passed in September 2026. However, the record does not specify business opening dates or operational status.

What is the address of the project?

The project is located at 1600 Maverick Drive, Marshall, TX 75670, in Harrison County.

Who designed the stadium upgrades?

Goodwin-Lasiter-Strong was the design firm of record for the Marshall ISD Stadium Upgrades - Phase II-B project.

What is the estimated cost per square foot?

The estimated cost is $882 per square foot, based on a total project cost of $3,000,000 and 3,400 square feet.

Was the project funded by public funds?

Yes, the project involves public funds, public land, or is a Federally funded roadway project, as noted in the TDLR filing.

What is Marshall ISD Stadium Upgrades - Phase II-B?

Marshall ISD Stadium Upgrades - Phase II-B is a new construction project at 1600 Maverick Drive in Marshall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New concession stand and home restrooms, update visitor restrooms, new fencing.

Is Marshall ISD Stadium Upgrades - Phase II-B open in Marshall?

Construction on Marshall ISD Stadium Upgrades - Phase II-B is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is Marshall ISD Stadium Upgrades - Phase II-B located?

Marshall ISD Stadium Upgrades - Phase II-B is located at 1600 Maverick Drive, Marshall, TX, 75670, in Harrison County.

Who is the owner or developer of Marshall ISD Stadium Upgrades - Phase II-B?

Marshall Independent School District is the property owner/developer of record for Marshall ISD Stadium Upgrades - Phase II-B, per its TDLR project registration.

Who is the architect or design firm for Marshall ISD Stadium Upgrades - Phase II-B?

Goodwin-Lasiter-Strong is the design firm of record for Marshall ISD Stadium Upgrades - Phase II-B, according to its TDLR filing.

How much does Marshall ISD Stadium Upgrades - Phase II-B cost and how big is it?

Marshall ISD Stadium Upgrades - Phase II-B has an estimated construction value of $3.0M and approximately 3,400 square feet (about $882/sqft), based on its TDLR filing.

Scope of Work

New concession stand and home restrooms, update visitor restrooms, new fencing.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1600 Maverick Drive, Marshall, TX, 75670

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75670 (Marshall)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Marshall?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.