Project intelligenceTDLR TABS2025001579New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr

4175 Uptown Dr, Houston, TX, 77045

Target date passed (May 2026)Project Registered

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr is a new construction project at 4175 Uptown Dr, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.4M across about 1 sq ft.

Estimated project value
$6.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6418.44K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 23, 2024610 days across supplied datesMay 26, 2026

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    189 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    421 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr

The Metropolitan Transit Authority of Harris County filed a registration for new construction at 4175 Uptown Dr in Houston. The project, identified in the filing as CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr, involves garage upgrades for the service and repair of hydrogen and compressed natural gas fueled vehicles. The estimated cost for this work is $6,418,439.

This project is located in Harris County, specifically within the 77045 ZIP code area. Census estimates for this ZIP code indicate a population of about 32,482 and a median household income of $61,166. The housing stock in this area is mostly owner-occupied, with a median owner-occupied home value of $163,600. These figures provide context for the community surrounding the transit facility.

Project Scope and Financials

The scope of work is defined as repair garage upgrades for the service and repair of hydrogen and compressed natural gas fueled vehicles. The estimated cost of $6,418,439 places this project above the median estimated cost for new construction filings in Harris County, which is $750,000. The scheduled build window is 421 days, which is longer than the county median of 223 days for similar projects. The filing lists the square footage as 1 sq ft, which likely reflects a specific administrative entry rather than the total physical footprint of the garage upgrades.

Registration and Status

The project was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2024. The construction start date per the filing is March 2025, with a target completion date of May 2026. Waldemar Tirado is the registered accessibility specialist associated with this filing. The project involves public funds, public land, or is a Federally funded roadway project.

According to the public record, no plan review or inspection has been recorded since registration. Therefore, whether the construction proceeded as scheduled is not confirmed in the available data. The Metropolitan Transit Authority of Harris County has six other TDLR-registered projects totaling $70,250,000, including the Northline Transit Center and the Maintenance of Way project. This project is one of several significant infrastructure investments by the authority in the region.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77045 (Houston)

One email per change. Unsubscribe in one click. Privacy.

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr is a New Construction project located at 4175 Uptown Dr, Houston, TX 77045 in Houston, Texas. The project has an estimated value of $6.4M covering 1 sq ft. Metropolitan Transit Authority of Harris County is the property owner. The project was registered with TDLR on September 23, 2024.

Frequently Asked Questions

What is the estimated cost of this project?

The estimated cost for the garage upgrades is $6,418,439. This figure is above the median estimated cost for new construction filings in Harris County, which is $750,000.

Who is the owner of the project?

The owner of record is the Metropolitan Transit Authority of Harris County. Waldemar Tirado is the registered accessibility specialist listed in the filing.

What is the scope of work?

The scope involves repair garage upgrades for the service and repair of hydrogen and compressed natural gas fueled vehicles. The project is classified as new construction.

Is there any inspection data available?

No plan review or inspection has been recorded in the public record since the project was registered in September 2024. The status of construction progress is not confirmed by inspection logs.

When was the project registered?

The project was registered with TDLR in September 2024. The filing indicates a construction start date of March 2025 and a target completion date of May 2026.

What is CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr?

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr is a new construction project at 4175 Uptown Dr in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REPAIR GARAGE UPGRADES FOR THE SERVICE AND REPAIR OF HYDROGEN AND COMPRESSED NATURAL GAS FUELED VEHICLES

Is CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr open in Houston?

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr was scheduled to finish construction in May 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr located?

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr is located at 4175 Uptown Dr, Houston, TX, 77045, in Harris County.

Who is the owner or developer of CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr?

Metropolitan Transit Authority of Harris County is the property owner/developer of record for CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr, per its TDLR project registration.

How much does CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr cost and how big is it?

CNG & H2 Facility Modification Houston Metro Hiram Clark 4175 Uptown Dr has an estimated construction value of $6.4M and approximately 1 square feet (about $6418.44K/sqft), based on its TDLR filing.

Scope of Work

REPAIR GARAGE UPGRADES FOR THE SERVICE AND REPAIR OF HYDROGEN AND COMPRESSED NATURAL GAS FUELED VEHICLES

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4175 Uptown Dr, Houston, TX, 77045

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77045 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.