Funding type
This project is privately funded, on private land for private use.
Cottonwood Creek Church Campus Addition Phase 2 Student Center
1015 Sam Rayburn Tollway, Allen, TX 75013, Allen, TX, 75013
Cottonwood Creek Church Campus Addition Phase 2 Student Center is a additions to existing building project at 1015 Sam Rayburn Tollway, Allen, TX 75013, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $3.6M across about 8,920 sq ft.
- Estimated project value
- $3.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 8,920 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $400/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 9 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
7 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
250 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75013 (Allen)
One email per change. Unsubscribe in one click. Privacy.
Cottonwood Creek Church Campus Addition Phase 2 Student Center is a Additions to Existing Building project located at 1015 Sam Rayburn Tollway, Allen, TX 75013, Allen, TX 75013 in Allen, Texas. The project has an estimated value of $3.6M covering 8,920 sq ft. Cottonwood Creek Church is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on September 23, 2024.
Frequently Asked Questions
What is Cottonwood Creek Church Campus Addition Phase 2 Student Center?
Cottonwood Creek Church Campus Addition Phase 2 Student Center is a additions to existing building project at 1015 Sam Rayburn Tollway, Allen, TX 75013 in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The proposed project includes the construction of an approximately 8,920 square feet addition to the Student Center (multi-purpose room), located adjacent to the existing Worship Facility.
Is Cottonwood Creek Church Campus Addition Phase 2 Student Center open in Allen?
Construction on Cottonwood Creek Church Campus Addition Phase 2 Student Center is complete — TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is Cottonwood Creek Church Campus Addition Phase 2 Student Center located?
Cottonwood Creek Church Campus Addition Phase 2 Student Center is located at 1015 Sam Rayburn Tollway, Allen, TX 75013, Allen, TX, 75013, in Collin County.
Who is the owner or developer of Cottonwood Creek Church Campus Addition Phase 2 Student Center?
Cottonwood Creek Church is the property owner/developer of record for Cottonwood Creek Church Campus Addition Phase 2 Student Center, per its TDLR project registration.
Who is the architect or design firm for Cottonwood Creek Church Campus Addition Phase 2 Student Center?
Parkhill is the design firm of record for Cottonwood Creek Church Campus Addition Phase 2 Student Center, according to its TDLR filing.
How much does Cottonwood Creek Church Campus Addition Phase 2 Student Center cost and how big is it?
Cottonwood Creek Church Campus Addition Phase 2 Student Center has an estimated construction value of $3.6M and approximately 8,920 square feet (about $400/sqft), based on its TDLR filing.
Scope of Work
The proposed project includes the construction of an approximately 8,920 square feet addition to the Student Center (multi-purpose room), located adjacent to the existing Worship Facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1015 Sam Rayburn Tollway, Allen, TX 75013, Allen, TX, 75013
Watch all construction in 75013 (Allen)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Allen?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.