Direct Edge
Direct Edge is a renovation/alteration project at 211 Osler Drive, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $800K across about 12,690 sq ft.
๐Project Metrics
TDLR #TABS2025001620Review Complete
Design review complete, construction may proceed
Direct Edge is a Renovation/Alteration project located at 211 Osler Drive, Arlington, TX 93277 in Arlington, Texas. The project has an estimated value of $800K covering 12,690 sq ft. KRUGER INDUSTRIAL PROPERTIES LP is the property owner and Design-Development Studios, Inc. is the design firm of record. The project was registered with TDLR on September 23, 2024.
โFrequently Asked Questions
What is Direct Edge?
Direct Edge is a renovation/alteration project at 211 Osler Drive in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New interior offices with eletcrical, mechanical, and Plumbing.
Is Direct Edge open in Arlington?
Direct Edge is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".
Where is Direct Edge located?
Direct Edge is located at 211 Osler Drive, Arlington, TX, 93277, in Tarrant County.
Who is the owner or developer of Direct Edge?
KRUGER INDUSTRIAL PROPERTIES LP is the property owner/developer of record for Direct Edge, per its TDLR project registration.
Who is the architect or design firm for Direct Edge?
Design-Development Studios, Inc. is the design firm of record for Direct Edge, according to its TDLR filing.
How much does Direct Edge cost and how big is it?
Direct Edge has an estimated construction value of $800K and approximately 12,690 square feet (about $63/sqft), based on its TDLR filing.
๐Scope of Work
New interior offices with eletcrical, mechanical, and Plumbing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 23, 2024
Review Complete
Sep 23, 2024
Inspection Complete
Closed