Sovereign Flavors - Second floor Build-out
๐Project Metrics
TDLR #TABS2025001761Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Flavoring and application laboratory build-out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$18.7M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Total demolition of pool 2110 sq ft circa 2003 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
RUN GAS LINE FROM METER TO GENERATOR.
interior remodel - see attachments for full scope of work Prewiring and fixtures 1 - Flood light 1 - Recess can in the front porch 2 - Recess can back patio 2 - recess cans in the powder bath Change foyer fixture to 4 - recess cans **Adding Level 2 EV Charger to the remodel.
Interior non structural demolition
Partial Demo - Addition/ remodel of SFR. two story addition to sfr. convert two existing bathrooms into a single bathroom & convert existing bedrooms into den. Stone patio and steel trellis to be removed to recover impervious coverage.