Glover ES - BP043 MEP Renovations in Missouri City, TX
1510 Columbia Blue Dr, Missouri City, TX, 77489
Glover ES - BP043 MEP Renovations is a renovation/alteration project at 1510 Columbia Blue Dr, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $220K across about 80,000 sq ft.
- Estimated project value
- $220K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 80,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $3/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
49 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
741 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Glover ES - BP043 MEP Renovations
Glover Elementary School in Missouri City is undergoing a renovation focused on HVAC repair and replacement. The project, filed as Glover ES - BP043 MEP Renovations, covers an estimated 80,000 square feet of the facility. With an estimated cost of $219,923, the work is scheduled to finish in December 2026.
The project owner is Fort Bend Independent School District. TDLR registered the accessibility specialist, William T Winning, in October 2024. Plan review was completed in the same month, and construction is scheduled to begin in November 2024. The TDLR status is Review Complete.
Scope and Cost
The scope of work is limited to HVAC repair and replacement. The estimated cost of $219,923 translates to approximately $3 per square foot. This figure is below the county median of $80 per square foot for similar renovation and alteration filings in Fort Bend County. The total estimated cost is close to the county median of $239,450 for this project type.
The scheduled build window for this project is 741 days. This is longer than the county median of 92 days for similar projects. The extended timeline reflects the scale of the 80,000 square foot facility and the specific nature of the MEP renovations.
Fort Bend Independent School District has six other TDLR-registered projects totaling $42,128,000. These include the FBISD BP056 Special Education Transportation Center for Excellence in Sugar Land and the Fort Bend ISD Aquatic Practice Facility in Fresno. Other registered projects in the Missouri City area include the Houston Knanaya Community Center and a Mechanic Shop.
Local Context
The project is located at 1510 Columbia Blue Dr, Missouri City, TX 77489. According to U.S. Census ACS 2023 five-year estimates for ZIP 77489, the population is about 39,054. The median household income is $74,097, and the median owner-occupied home value is $209,900. The area has 13,883 housing units, with housing predominantly owner-occupied.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77489 (Missouri City)
One email per change. Unsubscribe in one click. Privacy.
Glover ES - BP043 MEP Renovations is a Renovation/Alteration project located at 1510 Columbia Blue Dr, Missouri City, TX 77489 in Missouri City, Texas. The project has an estimated value of $220K covering 80,000 sq ft. Fort Bend Independent School District is the property owner. The project was registered with TDLR on October 2, 2024.
Frequently Asked Questions
What is the scope of work for Glover Elementary School?
The scope of work is HVAC repair and replacement. This is part of the Glover ES - BP043 MEP Renovations project filed with TDLR.
Who is the owner of the project?
The owner of record is Fort Bend Independent School District. The registered accessibility specialist is William T Winning.
When is the project scheduled to finish?
Construction is scheduled to finish in December 2026. Plan review was completed in October 2024, and work starts in November 2024.
What is the estimated cost of the renovation?
The estimated cost is $219,923. This amounts to approximately $3 per square foot for the 80,000 square foot facility.
Is the school open to the public?
The TDLR record tracks construction status, not business operations. The project is under renovation and scheduled to finish in December 2026.
What is Glover ES - BP043 MEP Renovations?
Glover ES - BP043 MEP Renovations is a renovation/alteration project at 1510 Columbia Blue Dr in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: HVAC Repair/Replacement
Is Glover ES - BP043 MEP Renovations open in Missouri City?
Glover ES - BP043 MEP Renovations is still under construction in Missouri City, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Glover ES - BP043 MEP Renovations located?
Glover ES - BP043 MEP Renovations is located at 1510 Columbia Blue Dr, Missouri City, TX, 77489, in Fort Bend County.
Who is the owner or developer of Glover ES - BP043 MEP Renovations?
Fort Bend Independent School District is the property owner/developer of record for Glover ES - BP043 MEP Renovations, per its TDLR project registration.
How much does Glover ES - BP043 MEP Renovations cost and how big is it?
Glover ES - BP043 MEP Renovations has an estimated construction value of $220K and approximately 80,000 square feet (about $3/sqft), based on its TDLR filing.
Scope of Work
HVAC Repair/Replacement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1510 Columbia Blue Dr, Missouri City, TX, 77489
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 77489 (Missouri City)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Missouri City?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.