Kids Acting is a renovation/alteration project at 6406 IH 35, suite 2150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $75K across about 8,100 sq ft.
Project has been registered with TDLR and is in pre-construction phase
Kids Acting is a Renovation/Alteration project located at 6406 IH 35, suite 2150, Austin, TX 78752 in Austin, Texas. The project has an estimated value of $75K covering 8,100 sq ft. Dean Davidov is the property owner and Studio Steinbomer is the design firm of record. The project was registered with TDLR on October 8, 2024.
Kids Acting is a renovation/alteration project at 6406 IH 35, suite 2150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: change of use for children's acting school
Kids Acting is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Kids Acting is located at 6406 IH 35, suite 2150, Austin, TX, 78752, in Travis County.
Dean Davidov is the property owner/developer of record for Kids Acting, per its TDLR project registration.
Studio Steinbomer is the design firm of record for Kids Acting, according to its TDLR filing.
Kids Acting has an estimated construction value of $75K and approximately 8,100 square feet (about $9/sqft), based on its TDLR filing.
change of use for children's acting school
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 8, 2024
Review Complete
Inspection Complete
Closed
Building permits found at or near this location
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA