Project intelligenceTDLR TABS2025002834New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Frisco - Downtown Parking Garage

3rd St and Elm St, Frisco, TX, 75034

Construction complete · Oct 2026Project Closed

City of Frisco - Downtown Parking Garage is a new construction project at 3rd St and Elm St, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $25.0M across about 185,000 sq ft.

Estimated project value
$25.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
185,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$135/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 9, 2024723 days across supplied datesOct 2, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    471 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    15 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    140 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Frisco - Downtown Parking Garage

The City of Frisco - Downtown Parking Garage is a new 4-story structure at 3rd St and Elm St in Frisco, TX 75034. The project features approximately 457 parking spaces across 5 parking levels. It is part of the Frisco Original Donation area in Collin County. The owner of record is the City of Frisco.

The estimated cost for this new construction is $25,000,000. The building covers 185,000 sq ft, resulting in a cost of $135 per sq ft. This cost per square foot is close to the Collin County median of $120 for similar new construction filings. The total estimated cost is above the county median for its type.

Project Timeline and Status

The project was registered with TDLR in October 2024. Plan review was completed in the same month. Construction started in January 2025. The scheduled completion date on the filing was April 2026. The final inspection passed in May 2026. TDLR closed the project file in October 2026, which marks the end of the accessibility review process for this construction.

The City of Frisco has six other TDLR-registered projects totaling $61,009,243. These include the BF Phillips Community Park and Grand Park Phase 1A. The downtown garage is located near existing businesses such as Randy's Steakhouse and Simply Thai Bistro - Main St. A listing on plugshare.com describes the site as having 2 Electric Vehicle (EV) Charging Stations maintained by ChargePoint. A map listing on us.maptons.com notes wheelchair access at the location.

The scheduled build window for this project was 471 days. This is longer than the Collin County median scheduled build window of 212 days for new construction. The area profile for ZIP 75034 shows a population of about 51,059 and a median household income of $107,945. The median owner-occupied home value in this Census estimate area is $679,500. The project involves public funds and public land.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75034 (Frisco)

One email per change. Unsubscribe in one click. Privacy.

City of Frisco - Downtown Parking Garage is a New Construction project located at 3rd St and Elm St, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $25.0M covering 185,000 sq ft. City of Frisco is the property owner. The project was registered with TDLR on October 9, 2024.

Frequently Asked Questions

Is the parking garage open for public use?

The TDLR record indicates the final inspection passed in May 2026 and the project file was closed in October 2026. Third-party listings, such as plugshare.com, describe EV charging stations at the site, suggesting operational features, but the record does not confirm a specific public opening date.

How many parking spaces does the garage have?

The filing states the new construction includes approximately 457 parking spaces. The structure is 4 stories high with 5 parking levels.

Who is the registered accessibility specialist?

Ernesto Sarabia is the registered accessibility specialist of record for this project.

When did construction start and finish?

Construction started in January 2025. The final inspection passed in May 2026.

What is City of Frisco - Downtown Parking Garage?

City of Frisco - Downtown Parking Garage is a new construction project at 3rd St and Elm St in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 4 story parking garage in Downtown Frisco Texas with approximately 457 parking spaces and 5 parking levels.

Is City of Frisco - Downtown Parking Garage open in Frisco?

Construction on City of Frisco - Downtown Parking Garage is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is City of Frisco - Downtown Parking Garage located?

City of Frisco - Downtown Parking Garage is located at 3rd St and Elm St, Frisco, TX, 75034, in Collin County.

Who is the owner or developer of City of Frisco - Downtown Parking Garage?

City of Frisco is the property owner/developer of record for City of Frisco - Downtown Parking Garage, per its TDLR project registration.

How much does City of Frisco - Downtown Parking Garage cost and how big is it?

City of Frisco - Downtown Parking Garage has an estimated construction value of $25.0M and approximately 185,000 square feet (about $135/sqft), based on its TDLR filing.

Scope of Work

New 4 story parking garage in Downtown Frisco Texas with approximately 457 parking spaces and 5 parking levels.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3rd St and Elm St, Frisco, TX, 75034

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75034 (Frisco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.