Administration Building in Rosenberg, TX
4810 Ave I, Rosenberg, TX, 77471
Administration Building is a new construction project at 4810 Ave I, Rosenberg, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $30.9M across about 95,641 sq ft.
- Estimated project value
- $30.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 95,641 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $323/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
65 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
502 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
45 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Administration Building
The Administration Building at 4810 Ave I in Rosenberg, Texas, is a new 95,641-square-foot facility for Lamar Consolidated ISD. The project passed its final TDLR accessibility inspection in June 2026, confirming that construction is complete. This mixed-use structure serves as the district's central administrative hub, replacing the need for dispersed office spaces to support the district's operational needs.
Lamar Consolidated ISD registered the project with the Texas Department of Licensing and Regulation (TDLR) in October 2024. The estimated cost for the new construction was $30,900,000. This figure places the project in the top quarter of new construction filings in Fort Bend County, where the median estimated cost is significantly lower. The scheduled build window from December 2024 to May 2026 spanned 502 days, which is longer than the county median of 201 days for similar projects.
Texas Arcadis served as the design firm of record for the project. The registered accessibility specialist was William T Winning. Funding for the project involves public funds, public land, or is a Federally funded roadway project, as noted in the TDLR filing. The project was registered with TDLR in October 2024, and plan review was completed in the same month.
Context and Comparisons
In Fort Bend County, the median estimated cost for new construction is $700,000, with a middle half ranging from $260,000 to $1,800,000. The median size is 9,215 square feet, and the median cost per square foot is $100. This project’s $323 per square foot is above the county median. Lamar Consolidated ISD has six other TDLR-registered projects totaling $11,261,202, including campus facilities in Fulshear and Richmond. Texas Arcadis has designed six other TDLR-registered projects totaling $164,655,000, including schools in Baytown, Spring, and Houston.
Local coverage has noted the district's response to growth with this new facility. A Community Impact post described the new administration building as a response to the district's expansion. The ZIP code 77471 has a population of about 45,078, with a median household income of $71,018. The median owner-occupied home value in the area is $235,000. Fort Bend County’s unemployment rate was 5.1 percent in June 2026, higher than a year earlier.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77471 (Rosenberg)
One email per change. Unsubscribe in one click. Privacy.
Administration Building is a New Construction project located at 4810 Ave I, Rosenberg, TX 77471 in Rosenberg, Texas. The project has an estimated value of $30.9M covering 95,641 sq ft. Lamar Consolidated ISD is the property owner and Texas Arcadis is the design firm of record. The project was registered with TDLR on October 16, 2024.
Frequently Asked Questions
Is the Administration Building complete?
Yes, the project passed its final TDLR accessibility inspection in June 2026. The TDLR status is listed as Inspection Complete, indicating that construction has finished.
Who is the owner of the building?
Lamar Consolidated ISD is the owner and developer of record. The building serves as the administration facility for the school district in Rosenberg.
How much did the project cost?
The estimated cost of the new construction was $30,900,000. This amount is above the median estimated cost for new construction projects in Fort Bend County.
Who designed the building?
Texas Arcadis was the design firm of record. William T Winning was the registered accessibility specialist for the project.
Is the building open for business?
The TDLR record confirms construction is complete. A Facebook post reported that the building officially opens in August, but the TDLR status only tracks construction completion.
What is Administration Building?
Administration Building is a new construction project at 4810 Ave I in Rosenberg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Administration building for Lamar CISD.
Is Administration Building open in Rosenberg?
Construction on Administration Building is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.
Where is Administration Building located?
Administration Building is located at 4810 Ave I, Rosenberg, TX, 77471, in Fort Bend County.
Who is the owner or developer of Administration Building?
Lamar Consolidated ISD is the property owner/developer of record for Administration Building, per its TDLR project registration.
Who is the architect or design firm for Administration Building?
Texas Arcadis is the design firm of record for Administration Building, according to its TDLR filing.
How much does Administration Building cost and how big is it?
Administration Building has an estimated construction value of $30.9M and approximately 95,641 square feet (about $323/sqft), based on its TDLR filing.
Scope of Work
Administration building for Lamar CISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4810 Ave I, Rosenberg, TX, 77471
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.59B totalWatch all construction in 77471 (Rosenberg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rosenberg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.