Project intelligenceTDLR TABS2025003368Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Memorial Hermann Alvin Exterior Improvements

210 N Highway 35 Bypass, Alvin, TX, 77511

Construction complete · Feb 2026Project Closed

Memorial Hermann Alvin Exterior Improvements is a renovation/alteration project at 210 N Highway 35 Bypass, Alvin, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $1.5M across about 1,300 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,300 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.15K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 16, 2024486 days across supplied datesFeb 14, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    336 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    41 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Memorial Hermann Alvin Exterior Improvements

Memorial Hermann Alvin Exterior Improvements is a completed renovation project located at 210 N Highway 35 Bypass in Alvin, Texas. The work involved remodeling an existing facility with an estimated cost of $1,500,000 and a scope covering 1,300 sq ft of exterior enhancements. TDLR closed the project file in February 2026, marking the end of the accessibility review process for this construction.

The project was registered with the Texas Department of Licensing and Regulation in October 2024. Construction began in November 2024, with a scheduled completion date of October 2025. The final inspection passed in January 2026, confirming that the physical work aligned with the approved plans. The owner of record is Memorial Hermann Southeast Hospital, which has registered six other TDLR projects totaling $5,375,000, several of which are also located at this same Alvin address.

Scope and Design

BSA-Architects, Inc. served as the design firm of record for this renovation. The scope of work included re-roofing the building, adding new windows and doors, and installing new canopies. The project also involved adding ADA/TAS parking, removing existing recessed loading docks, and installing a new generator with an enclosure. Additionally, a new RTU was installed as part of the exterior improvements.

The registered accessibility specialist for this filing is Jeromy G Murphy. The project was privately funded on private land for private use. In Brazoria County, the median estimated cost for similar renovation filings is $250,000, meaning this project’s cost is above the county median. The scheduled build window of 336 days is longer than the county median of 95 days for comparable work types.

Local Context

Alvin is located in Brazoria County, where the median household income is estimated at $77,015 by the U.S. Census Bureau. The ZIP code 77511 has a population of about 51,984 residents. This project contributes to the healthcare infrastructure in the area, supporting the Memorial Hermann Southeast Hospital facility. The construction phase has concluded, and the administrative process with TDLR is complete.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77511 (Alvin)

One email per change. Unsubscribe in one click. Privacy.

Memorial Hermann Alvin Exterior Improvements is a Renovation/Alteration project located at 210 N Highway 35 Bypass, Alvin, TX 77511 in Alvin, Texas. The project has an estimated value of $1.5M covering 1,300 sq ft. Memorial Hermann Southeast Hospital is the property owner and BSA-Architects, Inc. is the design firm of record. The project was registered with TDLR on October 16, 2024.

Frequently Asked Questions

Is the Memorial Hermann Alvin Exterior Improvements project finished?

Yes, the final inspection passed in January 2026. TDLR closed the project file in February 2026, indicating the construction and review process are complete.

Who owns the facility at 210 N Highway 35 Bypass?

The owner of record is Memorial Hermann Southeast Hospital. The facility is located in Alvin, Texas, within Brazoria County.

What specific work was done during the renovation?

Work included re-roofing, adding new windows, doors, and canopies, installing ADA/TAS parking, removing recessed loading docks, and adding a new generator enclosure and RTU.

How much did the project cost?

The estimated cost for the exterior improvements was $1,500,000. This figure is above the median cost for similar renovation filings in Brazoria County.

Who designed the project?

BSA-Architects, Inc. was the design firm of record. Jeromy G Murphy served as the registered accessibility specialist for the TDLR filing.

What is Memorial Hermann Alvin Exterior Improvements?

Memorial Hermann Alvin Exterior Improvements is a renovation/alteration project at 210 N Highway 35 Bypass in Alvin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodeling of an existing building which includes re-roofing the building, adding new windows & doors, adding new canopies, adding ADA/TAS parking, removing existing recessed loading docks, installing new generator & enclosure, installin…

Is Memorial Hermann Alvin Exterior Improvements open in Alvin?

Construction on Memorial Hermann Alvin Exterior Improvements is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.

Where is Memorial Hermann Alvin Exterior Improvements located?

Memorial Hermann Alvin Exterior Improvements is located at 210 N Highway 35 Bypass, Alvin, TX, 77511, in Brazoria County.

Who is the owner or developer of Memorial Hermann Alvin Exterior Improvements?

Memorial Hermann Southeast Hospital is the property owner/developer of record for Memorial Hermann Alvin Exterior Improvements, per its TDLR project registration.

Who is the architect or design firm for Memorial Hermann Alvin Exterior Improvements?

BSA-Architects, Inc. is the design firm of record for Memorial Hermann Alvin Exterior Improvements, according to its TDLR filing.

How much does Memorial Hermann Alvin Exterior Improvements cost and how big is it?

Memorial Hermann Alvin Exterior Improvements has an estimated construction value of $1.5M and approximately 1,300 square feet (about $1.15K/sqft), based on its TDLR filing.

Scope of Work

Remodeling of an existing building which includes re-roofing the building, adding new windows & doors, adding new canopies, adding ADA/TAS parking, removing existing recessed loading docks, installing new generator & enclosure, installing new RTU.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

210 N Highway 35 Bypass, Alvin, TX, 77511

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77511 (Alvin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.