SVP - Graef
SVP - Graef is a renovation/alteration project at 4110 N Main St, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $810K across about 4,200 sq ft.
๐Project Metrics
TDLR #TABS2025003579Review Complete
Design review complete, construction may proceed
SVP - Graef is a Renovation/Alteration project located at 4110 N Main St, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $810K covering 4,200 sq ft. Dave Novy Rentals is the property owner and Link Architecture is the design firm of record. The project was registered with TDLR on October 18, 2024.
โFrequently Asked Questions
What is SVP - Graef?
SVP - Graef is a renovation/alteration project at 4110 N Main St in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing veterinary clinic, building 1 and 2
Is SVP - Graef open in Taylor?
SVP - Graef is currently under construction in Taylor, TX. Its current TDLR status is "Review Complete".
Where is SVP - Graef located?
SVP - Graef is located at 4110 N Main St, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of SVP - Graef?
Dave Novy Rentals is the property owner/developer of record for SVP - Graef, per its TDLR project registration.
Who is the architect or design firm for SVP - Graef?
Link Architecture is the design firm of record for SVP - Graef, according to its TDLR filing.
How much does SVP - Graef cost and how big is it?
SVP - Graef has an estimated construction value of $810K and approximately 4,200 square feet (about $193/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of existing veterinary clinic, building 1 and 2
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 18, 2024
Review Complete
Oct 18, 2024
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$3.7M total๐Related City Permits
Building permits found at or near this location
Express: Replace windows (like for like)
Replacement of complete existing central heat and air system with or without duct work Main house.
*** Callout at 11:00 am yard trench only not going under foundation *** Replace and re-route sewer from home to city clean out.
Addition of conditioned space below grade and uncovered deck to single-story SFR
New construction In-ground pool with concrete deck; concrete pad for sport court.