Hillside Lane Reconstruction is a renovation/alteration project at 901 Hillside Lane, Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $69K across about 11,000 sq ft.
Project has been completed and closed
Hillside Lane Reconstruction is a Renovation/Alteration project located at 901 Hillside Lane, Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $69K covering 11,000 sq ft. Town of Flower Mound is the property owner and Westwood is the design firm of record. The project was registered with TDLR on October 18, 2024.
Hillside Lane Reconstruction is a renovation/alteration project at 901 Hillside Lane in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of road reconstruction and includes replacement of sidewalks and pedestrian ramps
Construction on Hillside Lane Reconstruction is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.
Hillside Lane Reconstruction is located at 901 Hillside Lane, Flower Mound, TX, 75028, in Denton County.
Town of Flower Mound is the property owner/developer of record for Hillside Lane Reconstruction, per its TDLR project registration.
Westwood is the design firm of record for Hillside Lane Reconstruction, according to its TDLR filing.
Hillside Lane Reconstruction has an estimated construction value of $69K and approximately 11,000 square feet (about $6/sqft), based on its TDLR filing.
Project consists of road reconstruction and includes replacement of sidewalks and pedestrian ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 18, 2024
Review Complete
Inspection Complete
Closed
Oct 31, 2024