FM 2499/FM3040
FM 2499/FM3040 is a renovation/alteration project at Interchange of FM2499 and FM3040, Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $2.6M across about 100,000 sq ft.
๐Project Metrics
TDLR #TABS2026023774Project Registered
Project has been registered with TDLR and is in pre-construction phase
FM 2499/FM3040 is a Renovation/Alteration project located at Interchange of FM2499 and FM3040, Flower Mound, TX 75022 in Flower Mound, Texas. The project has an estimated value of $2.6M covering 100,000 sq ft. Town of Flower Mound is the property owner and STV, Inc is the design firm of record. The project was registered with TDLR on June 24, 2026.
โFrequently Asked Questions
What is FM 2499/FM3040?
FM 2499/FM3040 is a renovation/alteration project at Interchange of FM2499 and FM3040 in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes improvements to the intersection of FM 2499 (Cross Timbers Road) and FM 3040 (Flower Mound Road). Proposed improvements include reconfiguring the intersection to provide dual left-turn lanes, three through lanes, andโฆ
Is FM 2499/FM3040 open in Flower Mound?
FM 2499/FM3040 is still under construction in Flower Mound, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is FM 2499/FM3040 located?
FM 2499/FM3040 is located at Interchange of FM2499 and FM3040, Flower Mound, TX, 75022, in Denton County.
Who is the owner or developer of FM 2499/FM3040?
Town of Flower Mound is the property owner/developer of record for FM 2499/FM3040, per its TDLR project registration.
Who is the architect or design firm for FM 2499/FM3040?
STV, Inc is the design firm of record for FM 2499/FM3040, according to its TDLR filing.
How much does FM 2499/FM3040 cost and how big is it?
FM 2499/FM3040 has an estimated construction value of $2.6M and approximately 100,000 square feet (about $26/sqft), based on its TDLR filing.
๐Scope of Work
The project includes improvements to the intersection of FM 2499 (Cross Timbers Road) and FM 3040 (Flower Mound Road). Proposed improvements include reconfiguring the intersection to provide dual left-turn lanes, three through lanes, and a dedicated
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 24, 2026
Review Complete
Inspection Complete
Closed