Project intelligenceTDLR TABS2025015067Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Somerset Drive Sidewalk Extension in Cedar Hill, TX

Somerset Drive, Cedar Hill, TX, 75104

Construction complete · Jan 2026Project Closed

Somerset Drive Sidewalk Extension is a renovation/alteration project at Somerset Drive, Cedar Hill, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $190K across about 6,950 sq ft.

Estimated project value
$190K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,950 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$27/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 25, 2025285 days across supplied datesJan 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    68 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Somerset Drive Sidewalk Extension

The Somerset Drive Sidewalk Extension in Cedar Hill is a completed renovation project that added approximately 1,390 linear feet of new pedestrian infrastructure. Located on Somerset Drive, the work extended the sidewalk from the Stadium Drive entrance northward to the end of the school property. This specific construction effort also included the installation of accessible ramps and repairs to road crossings to ensure safe passage for all users.

The City of Cedar Hill served as the owner of record for this $190,000 initiative. STV, Inc. was the design firm of record, while Andy Martin Mullins acted as the registered accessibility specialist. The project covered a total area of 6,950 square feet, resulting in a computed cost of $27 per square foot. This figure is below the Dallas County median of $73 per square foot for similar renovation and alteration filings.

Project Timeline and Status

Construction was scheduled to begin in June 2025, with a planned completion date of November 2025. The final inspection for the project passed in March 2025. TDLR closed the project file in January 2026, which marks the end of the accessibility review process for this construction. This closure confirms that the project has moved past its active review phase and is officially closed in the state records.

The scheduled build window for this project was 153 days, which is longer than the county median of 92 days for comparable work. Despite the extended timeline, the estimated cost remains below the $250,000 median for renovation and alteration projects in Dallas County. The project utilized public funds, reflecting the City of Cedar Hill's investment in local infrastructure improvements.

Cedar Hill has seen other significant development through the City as an owner. Other TDLR-registered projects under this ownership include the Cedar Hill Fire Department Headquarters and improvements to downtown streets. STV, Inc. has also been involved in other regional projects, such as the interchange of FM2499 and FM3040 in Flower Mound. These projects highlight the ongoing commitment to infrastructure development in the Dallas-Fort Worth area.

The Somerset Drive Sidewalk Extension contributes to the broader network of accessible pathways in Cedar Hill. With a population of approximately 49,425 in the 75104 ZIP code area, such improvements support daily commuting and local mobility. The project’s completion adds a vital link to the existing sidewalk system, enhancing connectivity for residents and students alike.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75104 (Cedar Hill)

One email per change. Unsubscribe in one click. Privacy.

Somerset Drive Sidewalk Extension is a Renovation/Alteration project located at Somerset Drive, Cedar Hill, TX 75104 in Cedar Hill, Texas. The project has an estimated value of $190K covering 6,950 sq ft. City of Cedar Hill is the property owner and STV, Inc is the design firm of record. The project was registered with TDLR on March 25, 2025.

Frequently Asked Questions

Is the Somerset Drive Sidewalk Extension finished?

Yes, the project is complete. The final inspection passed in March 2025, and TDLR closed the project file in January 2026, marking the end of the accessibility review process.

Who designed the Somerset Drive Sidewalk Extension?

STV, Inc. was the design firm of record for this project. Andy Martin Mullins served as the registered accessibility specialist, ensuring the work met required standards.

How much did the sidewalk extension cost?

The estimated cost for the Somerset Drive Sidewalk Extension was $190,000. This amount is below the Dallas County median of $250,000 for similar renovation and alteration projects.

What was the scope of the work?

The project included extending approximately 1,390 linear feet of sidewalk from Stadium Drive to the end of the school property, plus adding accessible ramps and repairing road crossings.

What is Somerset Drive Sidewalk Extension?

Somerset Drive Sidewalk Extension is a renovation/alteration project at Somerset Drive in Cedar Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Extending sidewalk from Stadium Dr entrance north to the end of school property. Approx 1390 LF of sidewalk plus accessible ramps & repairs to road crossings

Is Somerset Drive Sidewalk Extension open in Cedar Hill?

Construction on Somerset Drive Sidewalk Extension is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.

Where is Somerset Drive Sidewalk Extension located?

Somerset Drive Sidewalk Extension is located at Somerset Drive, Cedar Hill, TX, 75104, in Dallas County.

Who is the owner or developer of Somerset Drive Sidewalk Extension?

City of Cedar Hill is the property owner/developer of record for Somerset Drive Sidewalk Extension, per its TDLR project registration.

Who is the architect or design firm for Somerset Drive Sidewalk Extension?

STV, Inc is the design firm of record for Somerset Drive Sidewalk Extension, according to its TDLR filing.

How much does Somerset Drive Sidewalk Extension cost and how big is it?

Somerset Drive Sidewalk Extension has an estimated construction value of $190K and approximately 6,950 square feet (about $27/sqft), based on its TDLR filing.

Scope of Work

Extending sidewalk from Stadium Dr entrance north to the end of school property. Approx 1390 LF of sidewalk plus accessible ramps & repairs to road crossings

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Somerset Drive, Cedar Hill, TX, 75104

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75104 (Cedar Hill)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cedar Hill?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.