Cedar Hill Fire Department Headquarters
225 Cedar St, Cedar Hill, TX, 75104
Cedar Hill Fire Department Headquarters is a renovation/alteration project at 225 Cedar St, Cedar Hill, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $4.5M across about 10,338 sq ft.
- Estimated project value
- $4.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,338 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $435/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
26 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
61 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
307 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Cedar Hill Fire Department Headquarters
The Cedar Hill Fire Department Headquarters is being created through a renovation of the former library building at 225 Cedar St, Cedar Hill, TX 75104. This project converts 10,338 sq ft of existing space into a new fire station and a second future city department. The work is registered with TDLR and is scheduled to finish in April 2027.
Dekker, LLC serves as the design firm of record for this $4,500,000 project. The scope involves a complete remodel of the old library building to meet the operational needs of the fire department. Kimberly J Goss is the registered accessibility specialist listed on the filing. The project involves public funds and is located on public land in Dallas County.
Project Scope and Design
The estimated cost of $4,500,000 for the Cedar Hill Fire Department Headquarters translates to $435 per square foot. This figure is above the Dallas County median of $72 per square foot for similar renovation and alteration filings. The total project cost is also in the top quarter compared to the county median of $249,000 for this type of work. The scheduled build window of 368 days is longer than the county median of 92 days.
Construction is set to start in April 2026. TDLR completed the plan review process in June 2026, clearing the path for active construction phases. This status helps mitigate risk regarding water damage during the construction and future operational phases of the building.
Local Context and Ownership
The City of Cedar Hill has six other TDLR-registered projects totaling $5,296,884. These include the Cedar Hill Downtown Streets project and the N. Joe Wilson Rd and Calvert Dr. project, both of which have completed inspections. Dekker, LLC has four other registered projects totaling $7,580,000, including the DeSoto Fire Station 263 and the DeSoto Fire Training Center. The city’s broader development activity reflects a sustained investment in local infrastructure and public safety facilities.
U.S. Census ACS 2023 five-year estimates for ZIP 75104 show a population of about 49,425. The median household income in this area is $91,147, with 17,365 housing units. Most homes in the area are owner-occupied, with a median owner-occupied home value of $274,900. The Dallas County unemployment rate was 3.3 percent in July 2026, a figure higher than a year earlier. This local economic context supports the city’s capacity to fund and manage significant public infrastructure projects like the new fire headquarters.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75104 (Cedar Hill)
One email per change. Unsubscribe in one click. Privacy.
Cedar Hill Fire Department Headquarters is a Renovation/Alteration project located at 225 Cedar St, Cedar Hill, TX 75104 in Cedar Hill, Texas. The project has an estimated value of $4.5M covering 10,338 sq ft. City of Cedar Hill is the property owner and Dekker, LLC is the design firm of record. The project was registered with TDLR on March 25, 2026.
Frequently Asked Questions
Is the Cedar Hill Fire Department Headquarters open?
The TDLR record indicates construction is scheduled to finish in April 2027. The project status is Review Complete, but there is no information confirming that the building is open for public use or operational.
Who is designing the Cedar Hill Fire Department Headquarters?
Dekker, LLC is the design firm of record for this project. They are responsible for the architectural and engineering plans that have completed TDLR plan review.
What is the estimated cost of the renovation?
The estimated cost for the Cedar Hill Fire Department Headquarters renovation is $4,500,000. This figure covers the remodel of the old library building into the new fire station and future city department.
When did construction start on the project?
Construction is scheduled to start in April 2026. TDLR completed the plan review in June 2026, following the initial registration in March 2026.
Is the site in a flood zone?
It is designated as zone X on the FEMA National Flood Hazard Layer.
What is Cedar Hill Fire Department Headquarters?
Cedar Hill Fire Department Headquarters is a renovation/alteration project at 225 Cedar St in Cedar Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of old library building into FDHQ and second future City department
Is Cedar Hill Fire Department Headquarters open in Cedar Hill?
Cedar Hill Fire Department Headquarters is still under construction in Cedar Hill, TX, with an estimated completion of Apr 2027 according to its TDLR registration.
Where is Cedar Hill Fire Department Headquarters located?
Cedar Hill Fire Department Headquarters is located at 225 Cedar St, Cedar Hill, TX, 75104, in Dallas County.
Who is the owner or developer of Cedar Hill Fire Department Headquarters?
City of Cedar Hill is the property owner/developer of record for Cedar Hill Fire Department Headquarters, per its TDLR project registration.
Who is the architect or design firm for Cedar Hill Fire Department Headquarters?
Dekker, LLC is the design firm of record for Cedar Hill Fire Department Headquarters, according to its TDLR filing.
How much does Cedar Hill Fire Department Headquarters cost and how big is it?
Cedar Hill Fire Department Headquarters has an estimated construction value of $4.5M and approximately 10,338 square feet (about $435/sqft), based on its TDLR filing.
Scope of Work
Remodel of old library building into FDHQ and second future City department
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
225 Cedar St, Cedar Hill, TX, 75104
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$57.5M totalWatch all construction in 75104 (Cedar Hill)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cedar Hill?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.