Project intelligenceTDLR TABS2026019187New Construction
Funding type

This project is privately funded, on private land for private use.

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps

Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX, 76227

Construction complete · May 2026Inspection Complete

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a new construction project at Northwest of FM 2931 and E Blackjack Rd, Aubrey, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $50K across about 4,000 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 3, 2024863 days across supplied datesMay 15, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    849 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76227 (Aubrey)

One email per change. Unsubscribe in one click. Privacy.

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a New Construction project located at Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX 76227 in Aubrey, Texas. The project has an estimated value of $50K covering 4,000 sq ft. HMH Saratoga Land LLC is the property owner and Westwood is the design firm of record. The project was registered with TDLR on May 1, 2026.

Frequently Asked Questions

What is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a new construction project at Northwest of FM 2931 and E Blackjack Rd in Aubrey, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalks and curb ramps within a MUD district ROW, consisting of +/-4,000 SF of sidewalk and 1 curb ramp

Is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps open in Aubrey?

Construction on Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps located?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is located at Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX, 76227, in Denton County.

Who is the owner or developer of Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

HMH Saratoga Land LLC is the property owner/developer of record for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps, per its TDLR project registration.

Who is the architect or design firm for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

Westwood is the design firm of record for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps, according to its TDLR filing.

How much does Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps cost and how big is it?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps has an estimated construction value of $50K and approximately 4,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Construction of sidewalks and curb ramps within a MUD district ROW, consisting of +/-4,000 SF of sidewalk and 1 curb ramp

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76227 (Aubrey)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Denton

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists