Project intelligenceTDLR TABS2026019187New Construction
Funding type

This project is privately funded, on private land for private use.

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps in Aubrey, TX

Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX, 76227

Construction complete · May 2026Inspection Complete

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a new construction project at Northwest of FM 2931 and E Blackjack Rd, Aubrey, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $50K across about 4,000 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 3, 2024863 days across supplied datesMay 15, 2026

5 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    849 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    4 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps

The Phase 2A Subdivision Public Improvements project in Aubrey, Texas, is complete. Located northwest of FM 2931 and E Blackjack Rd in ZIP code 76227, this new construction effort focused on accessibility infrastructure within a MUD district right-of-way. The work involved building approximately 4,000 square feet of sidewalk and one curb ramp, with an estimated cost of $50,000. The project passed its final TDLR accessibility inspection in May 2026, confirming that construction is finished and the site meets required standards.

Project Scope and Ownership

HMH Saratoga Land LLC is the owner of record for this privately funded development. The filing identifies the project as Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps, highlighting its specific role in connecting residential areas. Westwood served as the design firm of record, guiding the technical aspects of the build. Paul J Glenn was the registered accessibility specialist responsible for ensuring the design met compliance requirements. The total square footage of 4,000 sq ft translates to a cost of $12 per square foot, a figure significantly below the Denton County median of $121 per square foot for similar new construction filings.

Construction began in January 2024, and the timeline extended to May 2026 for completion. This 863-day build window is longer than the county median of 218 days for comparable projects. While the duration was extended, the final cost remained in the bottom quarter of Denton County new construction estimates, which typically range from $315,000 to $2,800,000 for the middle half of filings. The project’s modest scale reflects its specific utility purpose rather than a large-scale commercial or residential build.

Regional Context and Design Firm

Westwood has registered six other TDLR projects in the region, totaling approximately $7.89 million in estimated costs. These include developments in Mansfield, Anna, North Richland Hills, and Irving, indicating a consistent presence in Denton County infrastructure and retail design. The local area, ZIP code 76227, has a population of about 55,437 with a median household income of $107,065. Housing in this area is predominantly owner-occupied, with a median home value of $376,200, suggesting a stable residential market where public improvements like sidewalks and curb ramps are essential for daily access.

The completion of this project adds to the existing infrastructure in Denton County, where the unemployment rate stood at 4.3 percent in July 2026. By finishing the sidewalk and curb ramp installation, HMH Saratoga Land LLC has delivered a key accessibility component for the Saratoga Phase 2A subdivision. The final TDLR accessibility inspection in May 2026 serves as the official record that the work was performed to code and is ready for public use.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76227 (Aubrey)

One email per change. Unsubscribe in one click. Privacy.

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a New Construction project located at Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX 76227 in Aubrey, Texas. The project has an estimated value of $50K covering 4,000 sq ft. HMH Saratoga Land LLC is the property owner and Westwood is the design firm of record. The project was registered with TDLR on May 1, 2026.

Frequently Asked Questions

Is the Phase 2A Subdivision Public Improvements project finished?

Yes, the project is complete. It passed its final TDLR accessibility inspection in May 2026, confirming that the construction of sidewalks and curb ramps is finished.

Who owns the Phase 2A Subdivision Public Improvements project?

HMH Saratoga Land LLC is the owner of record. The project is privately funded and located on private land for private use within a MUD district.

What was the cost of the Phase 2A Subdivision Public Improvements project?

The estimated cost was $50,000. This translates to $12 per square foot for the 4,000 square feet of sidewalk and one curb ramp constructed.

Where is the Phase 2A Subdivision Public Improvements project located?

It is located northwest of FM 2931 and E Blackjack Rd in Aubrey, TX 76227, within Denton County.

Who designed the Phase 2A Subdivision Public Improvements project?

Westwood was the design firm of record. Paul J Glenn served as the registered accessibility specialist for the project.

What is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is a new construction project at Northwest of FM 2931 and E Blackjack Rd in Aubrey, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of sidewalks and curb ramps within a MUD district ROW, consisting of +/-4,000 SF of sidewalk and 1 curb ramp

Is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps open in Aubrey?

Construction on Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is complete — TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.

Where is Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps located?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps is located at Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX, 76227, in Denton County.

Who is the owner or developer of Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

HMH Saratoga Land LLC is the property owner/developer of record for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps, per its TDLR project registration.

Who is the architect or design firm for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps?

Westwood is the design firm of record for Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps, according to its TDLR filing.

How much does Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps cost and how big is it?

Saratoga Phase 2A - Subdivision Public Sidewalks and Curb Ramps has an estimated construction value of $50K and approximately 4,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Construction of sidewalks and curb ramps within a MUD district ROW, consisting of +/-4,000 SF of sidewalk and 1 curb ramp

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Northwest of FM 2931 and E Blackjack Rd, Aubrey, TX, 76227

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76227 (Aubrey)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.