Blackhawk Blvd. Reconstruction Phase II Repackage C in Friendswood, TX
15355 Blackhawk Blvd, Friendswood, TX, 77546
Blackhawk Blvd. Reconstruction Phase II Repackage C is a renovation/alteration project at 15355 Blackhawk Blvd, Friendswood, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2028. The project has an estimated value of $8.8M across about 20,600 sq ft.
- Estimated project value
- $8.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 20,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $425/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
526 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
792 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Blackhawk Blvd. Reconstruction Phase II Repackage C
The City of Friendswood is undertaking a major roadway renovation project known as Blackhawk Blvd. Reconstruction Phase II Repackage C. This project involves the reconstruction of pavement along Blackhawk Blvd from FM2351 to Geneva De & Thursa Ln to FM 528. The total estimated cost for this work is $8,765,000, covering an area of 20,600 sq ft.
Construction is scheduled to finish in June 2028, with the work set to begin in April 2026. The project was registered with TDLR in October 2024, and plan review was completed in the same month. The current status on the TDLR record is Review Complete.
Scope of work includes the installation of 3,620 LF of storm sewer ranging in size. The project also involves removing and replacing approximately 19,300 sy of concrete pavement, including driveways and sidewalks, and adding 5,600 sq ft of new pavement. This is classified as a Renovation/Alteration project in Harris County.
The design firm of record is HDR Engineering, Inc. The registered accessibility specialist for this project is Kathy S Rodriguez. The project involves public funds, public land, or is a Federally funded roadway project. The owner of record is the City of Friendswood.
For context, the median estimated cost for renovation/alteration filings in Harris County is $250,000. This project's cost is above the county median for its type. The median size for such projects is 4,000 sq ft, while this project is 20,600 sq ft. The median cost per square foot in the county is $80, whereas this project is $425 per sq ft. The median scheduled build window in the county is 92 days, while this project has a scheduled build window of 792 days.
The City of Friendswood has six other TDLR-registered projects totaling $18,270,000. These include Friendswood City Hall, City Hall, Blackhawk Building, and the Friendswood Volunteer Fire Department - Station No.2. HDR Engineering, Inc has six other TDLR-registered projects totaling $842,563,745, including Port Aransas Marina and City Hall, City of West University Place.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77546 (Friendswood)
One email per change. Unsubscribe in one click. Privacy.
Blackhawk Blvd. Reconstruction Phase II Repackage C is a Renovation/Alteration project located at 15355 Blackhawk Blvd, Friendswood, TX 77546 in Friendswood, Texas. The project has an estimated value of $8.8M covering 20,600 sq ft. City of Friendswood is the property owner and HDR Engineering, Inc is the design firm of record. The project was registered with TDLR on October 22, 2024.
Frequently Asked Questions
When will construction start and finish?
Construction is scheduled to start in April 2026 and is scheduled to finish in June 2028.
What is the estimated cost of the project?
The estimated cost for the Blackhawk Blvd. Reconstruction Phase II Repackage C project is $8,765,000.
Who is the design firm for this project?
The design firm of record for this project is HDR Engineering, Inc.
What is the scope of work?
The scope includes pavement reconstruction, installation of 3,620 LF of storm sewer, and replacing 19,300 sy of concrete pavement.
Is the project currently open for public use?
The project status is Review Complete, and construction is scheduled to start in April 2026. It is not open.
What is Blackhawk Blvd. Reconstruction Phase II Repackage C?
Blackhawk Blvd. Reconstruction Phase II Repackage C is a renovation/alteration project at 15355 Blackhawk Blvd in Friendswood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Pavement reconstruction along Blackhawk Blvd from FM2351 to Geneva De & Thursa Ln to FM 528. Installation of 3620 LF of storm sewer ranging in size. Removing & Replacing appr 19300sy of concrete pavement, including driveways and sidewalk…
Is Blackhawk Blvd. Reconstruction Phase II Repackage C open in Friendswood?
Blackhawk Blvd. Reconstruction Phase II Repackage C is still under construction in Friendswood, TX, with an estimated completion of Jun 2028 according to its TDLR registration.
Where is Blackhawk Blvd. Reconstruction Phase II Repackage C located?
Blackhawk Blvd. Reconstruction Phase II Repackage C is located at 15355 Blackhawk Blvd, Friendswood, TX, 77546, in Harris County.
Who is the owner or developer of Blackhawk Blvd. Reconstruction Phase II Repackage C?
City of Friendswood is the property owner/developer of record for Blackhawk Blvd. Reconstruction Phase II Repackage C, per its TDLR project registration.
Who is the architect or design firm for Blackhawk Blvd. Reconstruction Phase II Repackage C?
HDR Engineering, Inc is the design firm of record for Blackhawk Blvd. Reconstruction Phase II Repackage C, according to its TDLR filing.
How much does Blackhawk Blvd. Reconstruction Phase II Repackage C cost and how big is it?
Blackhawk Blvd. Reconstruction Phase II Repackage C has an estimated construction value of $8.8M and approximately 20,600 square feet (about $425/sqft), based on its TDLR filing.
Scope of Work
Pavement reconstruction along Blackhawk Blvd from FM2351 to Geneva De & Thursa Ln to FM 528. Installation of 3620 LF of storm sewer ranging in size. Removing & Replacing appr 19300sy of concrete pavement, including driveways and sidewalks add 5600sq
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
15355 Blackhawk Blvd, Friendswood, TX, 77546
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$39.0M totalWatch all construction in 77546 (Friendswood)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Friendswood?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.