Dairy Queen Lakeway
๐Project Metrics
TDLR #TABS2025003834Review Complete
Design review complete, construction may proceed
๐Scope of Work
Ground Up New Construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater INSTALL 50GAL WATER HEATER
ETJ disconnect/reconnect services to install ATS for generator. This project involves coordinating with Austin Energy to temporarily remove and reinstall the existing utility meter in order to facilitate the connection of a Kohler 26kW standby generators automatic transfer switch (ATS) to the residential electrical service. No new meter is being installed and the generator installation itself has been separately permitted and inspected through the City of Lakeway. This permit request pertains solely to the temporary de-energization of the service to allow safe installation of the ATS. The scope of work includes coordinating with Austin Energy to perform a work-with meter pull completing the required electrical connections between the service panel and the ATS and reinstalling the existing meter upon completion. No service upgrade meter base replacement or structural modifications are included. All work will be performed in compliance with applicable codes and safety standards.
Service only upgrade from 200amp underground to 225amp
Install circuit for EV car charger outdoors
install irrigation system