Clifford Chance is a renovation/alteration project at 845 Texas Street Suite 2700, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2026). The project has an estimated value of $20.0M across about 60,400 sq ft.
Final inspection completed, awaiting project closure
Clifford Chance is a Renovation/Alteration project located at 845 Texas Street Suite 2700, Houston, TX 77002 in Houston, Texas. The project has an estimated value of $20.0M covering 60,400 sq ft. Block 58 LLC is the property owner and Gensler is the design firm of record. The project was registered with TDLR on October 23, 2024.
Clifford Chance is a renovation/alteration project at 845 Texas Street Suite 2700 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILD-OUT OF AN OFFICE INCLUDING NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW CEILING, HVAC, ELECTRICAL, AND PLUMBING.
Construction on Clifford Chance is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2026. The building is finished and very likely open.
Clifford Chance is located at 845 Texas Street Suite 2700, Houston, TX, 77002, in Harris County.
Block 58 LLC is the property owner/developer of record for Clifford Chance, per its TDLR project registration.
Gensler is the design firm of record for Clifford Chance, according to its TDLR filing.
Clifford Chance has an estimated construction value of $20.0M and approximately 60,400 square feet (about $331/sqft), based on its TDLR filing.
INTERIOR BUILD-OUT OF AN OFFICE INCLUDING NON-LOAD BEARING PARTITIONS, NEW FINISHES, NEW CEILING, HVAC, ELECTRICAL, AND PLUMBING.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 23, 2024
Review Complete
Oct 23, 2024
Inspection Complete
Mar 3, 2026
Closed
496d
Construction phase