King Road Reconstruction
King Road, Frisco, TX, 75036
King Road Reconstruction is a renovation/alteration project at King Road, Frisco, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $12.0M across about 4,500 sq ft.
- Estimated project value
- $12.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,500 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $2.67K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
113 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
865 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75036 (Frisco)
One email per change. Unsubscribe in one click. Privacy.
King Road Reconstruction is a Renovation/Alteration project located at King Road, Frisco, TX 75036 in Frisco, Texas. The project has an estimated value of $12.0M covering 4,500 sq ft. Frisco, Little Elm, Hackberry, and Denton County is the property owner and TNP, Inc. is the design firm of record. The project was registered with TDLR on October 25, 2024.
Frequently Asked Questions
What is King Road Reconstruction?
King Road Reconstruction is a renovation/alteration project at King Road in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction and widening of approximately 4,500 linear feet of existing two-lane rural-section roadway to a three-lane and four-lane urban section with sidewalks on both sides of the road.
Is King Road Reconstruction open in Frisco?
King Road Reconstruction is still under construction in Frisco, TX, with an estimated completion of Jun 2027 according to its TDLR registration.
Where is King Road Reconstruction located?
King Road Reconstruction is located at King Road, Frisco, TX, 75036, in Denton County.
Who is the owner or developer of King Road Reconstruction?
Frisco, Little Elm, Hackberry, and Denton County is the property owner/developer of record for King Road Reconstruction, per its TDLR project registration.
Who is the architect or design firm for King Road Reconstruction?
TNP, Inc. is the design firm of record for King Road Reconstruction, according to its TDLR filing.
How much does King Road Reconstruction cost and how big is it?
King Road Reconstruction has an estimated construction value of $12.0M and approximately 4,500 square feet (about $2.67K/sqft), based on its TDLR filing.
Scope of Work
Reconstruction and widening of approximately 4,500 linear feet of existing two-lane rural-section roadway to a three-lane and four-lane urban section with sidewalks on both sides of the road.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
King Road, Frisco, TX, 75036
Related Projects
Watch all construction in 75036 (Frisco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Frisco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.