Project intelligenceTDLR TABS2025004183Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Wilchester ES Vestibule Renovation in Houston, TX

13618 St Marys Lane, Houston, TX, 77079

Construction complete · Jun 2026Project Closed

Wilchester ES Vestibule Renovation is a renovation/alteration project at 13618 St Marys Lane, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $300K across about 1,161 sq ft.

Estimated project value
$300K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,161 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$258/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 28, 2024600 days across supplied datesJun 20, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    216 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  5. Project closed · TDLR filing

    The project record was closed in TDLR.

    323 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Wilchester ES Vestibule Renovation

The renovation of the entry vestibule at Wilchester Elementary School in Houston is complete. This project, filed as Wilchester ES Vestibule Renovation, focused on altering the existing entrance of the school located at 13618 St Marys Lane. The work covered 1,161 sq ft of space within Harris County.

Spring Branch ISD served as the owner of record for this renovation. The design firm of record was Stantec Architecture, Inc., which handled the architectural aspects of the update. William T Winning was the registered accessibility specialist associated with the filing. The project involved public funds, reflecting its status as a public school infrastructure improvement.

Project Scope and Cost

The estimated cost for the vestibule renovation was $300,000. This figure translates to a cost of $258 per square foot. In comparison to the 39,241 TDLR-registered renovation and alteration filings in Harris County, this project’s cost sits above the county median of $250,000. The median cost per square foot for similar filings in the county is $80, making this project’s rate significantly higher than the typical benchmark for the region.

Construction was scheduled to begin in June 2025, with a planned completion date of August 2025. The scheduled build window was 61 days, which is shorter than the county median of 92 days for similar projects. The final inspection passed in August 2025, confirming the completion of the work. TDLR closed the project file in June 2026, marking the end of the accessibility review process for this construction.

Regional Context

Wilchester Elementary School is part of a broader portfolio for Spring Branch ISD, which has six other TDLR-registered projects totaling $61,960,493. These include renovations at Northbrook High School and new construction at Rummel Creek Elementary School. Stantec Architecture, Inc. has also worked on six other projects totaling $12,330,000, including renovations in Round Rock and Austin.

The surrounding area, ZIP code 77079, has a population of about 35,540 with a median household income of $103,089. The median owner-occupied home value is $636,100. Other registered projects in the area include renovations at Memorial Hermann Memorial City Medical Center and Elite Dermatology Memorial, highlighting ongoing development in the neighborhood.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77079 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Wilchester ES Vestibule Renovation is a Renovation/Alteration project located at 13618 St Marys Lane, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $300K covering 1,161 sq ft. Spring Branch ISD is the property owner and Stantec Architecture, Inc. is the design firm of record. The project was registered with TDLR on October 28, 2024.

Frequently Asked Questions

Is Wilchester Elementary School open?

The TDLR record confirms the construction renovation is complete and the project file is closed. This indicates the physical work on the vestibule is finished, but the record does not provide information about the school's daily operational status or opening hours.

Who was the design firm for the Wilchester ES vestibule renovation?

Stantec Architecture, Inc. is listed as the design firm of record for this project. They were responsible for the architectural design associated with the entry vestibule renovation at the Houston school.

When was the final inspection passed for this project?

The final inspection passed in August 2025. This date aligns with the completion date listed on the filing, confirming that the renovation work was verified as complete at that time.

What was the estimated cost of the Wilchester ES renovation?

The estimated cost was $300,000. This amount covers the renovation of the entry vestibule, which spans 1,161 sq ft. The cost per square foot is calculated at $258.

Which school district owns Wilchester Elementary School?

Spring Branch ISD is the owner of record for this project. They are responsible for the infrastructure improvements at the school located in Houston, Texas.

What is Wilchester ES Vestibule Renovation?

Wilchester ES Vestibule Renovation is a renovation/alteration project at 13618 St Marys Lane in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to entry vestibule for existing elementary school

Is Wilchester ES Vestibule Renovation open in Houston?

Construction on Wilchester ES Vestibule Renovation is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Wilchester ES Vestibule Renovation located?

Wilchester ES Vestibule Renovation is located at 13618 St Marys Lane, Houston, TX, 77079, in Harris County.

Who is the owner or developer of Wilchester ES Vestibule Renovation?

Spring Branch ISD is the property owner/developer of record for Wilchester ES Vestibule Renovation, per its TDLR project registration.

Who is the architect or design firm for Wilchester ES Vestibule Renovation?

Stantec Architecture, Inc. is the design firm of record for Wilchester ES Vestibule Renovation, according to its TDLR filing.

How much does Wilchester ES Vestibule Renovation cost and how big is it?

Wilchester ES Vestibule Renovation has an estimated construction value of $300K and approximately 1,161 square feet (about $258/sqft), based on its TDLR filing.

Scope of Work

Renovation to entry vestibule for existing elementary school

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

13618 St Marys Lane, Houston, TX, 77079

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77079 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.