HMB Hybrid OR Upgrade
HMB Hybrid OR Upgrade is a renovation/alteration project at 4401 Garth Rd., Baytown, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2025). The project has an estimated value of $900K across about 1,088 sq ft.
๐Project Metrics
TDLR #TABS2025004290Project Closed
Project has been completed and closed
HMB Hybrid OR Upgrade is a Renovation/Alteration project located at 4401 Garth Rd., Baytown, TX 77521 in Baytown, Texas. The project has an estimated value of $900K covering 1,088 sq ft. San Jacinto Methodist Hospital is the property owner and PhiloWilke Partnership is the design firm of record. The project was registered with TDLR on October 28, 2024.
โFrequently Asked Questions
What is HMB Hybrid OR Upgrade?
HMB Hybrid OR Upgrade is a renovation/alteration project at 4401 Garth Rd. in Baytown, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Upgrade of OR 9 floor finishes and equipment. Minor wall material patchwork.
Is HMB Hybrid OR Upgrade open in Baytown?
Construction on HMB Hybrid OR Upgrade is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2025. The building is finished and very likely open.
Where is HMB Hybrid OR Upgrade located?
HMB Hybrid OR Upgrade is located at 4401 Garth Rd., Baytown, TX, 77521, in Harris County.
Who is the owner or developer of HMB Hybrid OR Upgrade?
San Jacinto Methodist Hospital is the property owner/developer of record for HMB Hybrid OR Upgrade, per its TDLR project registration.
Who is the architect or design firm for HMB Hybrid OR Upgrade?
PhiloWilke Partnership is the design firm of record for HMB Hybrid OR Upgrade, according to its TDLR filing.
How much does HMB Hybrid OR Upgrade cost and how big is it?
HMB Hybrid OR Upgrade has an estimated construction value of $900K and approximately 1,088 square feet (about $827/sqft), based on its TDLR filing.
๐Scope of Work
Upgrade of OR 9 floor finishes and equipment. Minor wall material patchwork.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 28, 2024
Review Complete
Inspection Complete
Closed
Mar 14, 2025